Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

45 Langside Ave

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct rear addition, deck, roof over porch and interior alterations to existing sfd

    Applied Oct 26, 2020 · issued Nov 4, 2020 · Permit 20 210916 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct rear addition, deck, roof over porch and interior alterations to existing sfd

    Applied Oct 26, 2020 · issued Oct 28, 2020 · Permit 20 210916 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct rear addition, deck, roof over porch and interior alterations to existing sfd

    Applied Oct 26, 2020 · issued Oct 28, 2020 · Permit 20 210916 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct rear addition, deck, roof over porch and interior alterations to existing sfd

    Applied Oct 26, 2020 · issued Oct 28, 2020 · Permit 20 210916 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 137-149 Church Street

    53 storeys · 463 homes · Mixed use

    460 m away · Site plan · Under review · filed Sep 21, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Langside Ave · Minor variance

    To construct a second storey addition above the existing dwelling, a covered front porch, and a deck in the rear yard.

    100 m away · filed Aug 20, 2026 · Hearing scheduled

  • 194 Gary Dr · Minor variance

    To construct a new garden suite in the rear yard.

    200 m away · filed Feb 13, 2026 · Approved

  • 55 Lockerbie Ave · Minor variance

    To construct a partial second storey addition above the existing dwelling, a two-storey front addition, two new basement walk-outs, a new rear deck and a new front porch.

    200 m away · filed Aug 18, 2025 · Approved

  • 42 Deerhurst Ave · Minor variance

    To construct a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a rear yard deck with a basement walk-out.

    60 m away · filed Nov 1, 2022 · Approved

  • 27 Portage Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Feb 8, 2022 · Approved

  • 7 Ranwood Dr · Minor variance

    To construct a second storey addition, two-storey rear and south side additions and a new rear deck.

    180 m away · filed Nov 29, 2021 · Approved

  • 29 Ranwood Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed Oct 21, 2021 · Refused

  • 53 Langside Ave · Minor variance

    To construct a new detached garage in the rear yard.

    50 m away · filed Oct 7, 2021 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.