Toronto address · Ward 13, Toronto Centre
451 Wellesley St E
The City of Toronto has 3 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing
Plumbing - Proposal for 2nd and 3rd floor rear addition and new rear deck
Applied Apr 21, 2026 · issued Jun 5, 2026 · Permit 26 144023 PLB
- Permit issued
Small residential project · Multiple projects
Proposal for 2nd and 3rd floor rear addition and new rear deck to an Existing SFD Semi-Detached House.
Applied Apr 15, 2026 · issued Jun 5, 2026 · Permit 26 144023 BLD
- Closed
Small residential project · Party wall admin permits
Admin. party wall permit for work being done at 449 Wellesley St E.
Applied Aug 28, 2017 · issued Sep 29, 2017 · completed May 14, 2021 · Permit 17 224134 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.
Decision: Approved (hearing Feb 4, 2026)
Filed Sep 9, 2025 · File A0688/25TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
5 Parkview Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.
70 m away · filed Jul 17, 2024 · Approved
37 Hill Crest Pk · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to reconstruct the wood deck (along the front, east side, and rear wall), and to construct a rear yard parking pad.
160 m away · filed Sep 27, 2023 · Approved
116 Amelia St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.
180 m away · filed Jan 30, 2023 · Approved
82 Salisbury Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).
200 m away · filed Dec 14, 2022 · Approved
92 Amelia St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.
240 m away · filed Oct 25, 2022 · Approved
433 Wellesley St E · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition and a rear ground floor deck.
50 m away · filed Oct 2, 2020 · Approved
89 Amelia St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear third storey dormer.
240 m away · filed Mar 4, 2020 · Approved
402 Wellesley St E · Minor variance
To rebuild the above grade rear walls at the ground and second floor level of a three-storey multi unit semi-detached dwelling. The repair of the existing basement walls required the rebuild of sections of the above grade walls.
190 m away · filed Dec 10, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.