Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

457 Martin Grove Rd

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Existing two storey SFD to be expanded with an addition at the rear of the property with a vented and insulated crawl space. The expansion to accommodate an expanded kitchen as well as well as a powder room and a stacked washer/dryer at the ground floor. At the second floor the addition to consist of expanded bedroom and walk-in closet space.

    Applied Jul 6, 2021 · issued Jul 29, 2021 · completed Dec 5, 2023 · Permit 21 173324 HVA

    Closed
  • Plumbing

    Plumbing - Existing two storey SFD to be expanded with an addition at the rear of the property with a vented and insulated crawl space. The expansion to accommodate an expanded kitchen as well as well as a powder room and a stacked washer/dryer at the ground floor. At the second floor the addition to consist of expanded bedroom and walk-in closet space.

    Applied Jun 20, 2021 · issued Jul 29, 2021 · completed Dec 5, 2023 · Permit 21 173324 PLB

    Closed
  • Small residential project · Addition(s)

    Existing two storey SFD to be expanded with an addition at the rear of the property with a vented and insulated crawl space. The expansion to accommodate an expanded kitchen as well as well as a powder room and a stacked washer/dryer at the ground floor. At the second floor the addition to consist of expanded bedroom and walk-in closet space.

    Applied Jun 20, 2021 · issued Jul 29, 2021 · completed Jan 2, 2024 · Permit 21 173324 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey front addition.

    Decision: Approved (hearing May 25, 2021)

    Filed Feb 2, 2021 · File A0071/21EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.