Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

46 Hickson St

The City of Toronto has 6 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REV01: Revision to issued permit 18-152159 PLB. Additional sink added to second floor. Plumbing - Proposal for multiple projects to an existing 2 storey townhouse - single family dwelling. Scope of work includes reconstruction of a 2 storey rear addition, a new 3rd floor addition.

    Applied Oct 2, 2018 · issued Oct 2, 2018 · completed Nov 22, 2019 · Permit 18 152159 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 2 storey townhouse - single family dwelling. Scope of work includes reconstruction of a 2 storey rear addition, a new 3rd floor addition.

    Applied Jul 10, 2018 · issued Jul 16, 2018 · completed Nov 22, 2019 · Permit 18 152159 HVA

    Closed
  • Small residential project · Party wall admin permits

    Admin permit for work inconjunction with 44 Hickson St

    Applied Jun 19, 2018 · issued Jun 20, 2018 · completed Feb 23, 2023 · Permit 18 181041 BLD

    Closed
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 2 storey townhouse - single family dwelling. Scope of work includes reconstruction of a 2 storey rear addition, a new 3rd floor addition.

    Applied May 2, 2018 · issued May 10, 2018 · Permit 18 152159 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 2 storey townhouse - single family dwelling. Scope of work includes reconstruction of a 2 storey rear addition, a new 3rd floor addition.

    Applied May 2, 2018 · issued May 10, 2018 · completed Nov 22, 2019 · Permit 18 152159 PLB

    Closed
  • Small residential project · Party wall admin permits

    Admin permit for 18-134953 - 44 Hickson St.

    Applied May 2, 2018 · issued May 3, 2018 · completed Feb 17, 2023 · Permit 18 152051 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey townhouse by constructing a rear two-storey addition and a complete third storey addition.

    Decision: Approved (hearing Oct 11, 2017)

    Filed Jun 5, 2017 · File A0642/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 15 Wyndham St · Minor variance

    To construct a one-storey ancillary building (art workshop), including a green roof, in the rear yard (abutting Mechanic Avenue).

    250 m away · filed Jul 31, 2026 · Hearing scheduled

  • 21 St Clarens Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting Wyndham Street and the public laneway.

    220 m away · filed Jan 12, 2026 · Approved

  • 1596 Dundas St W · Minor variance

    To alter the existing three-storey mixed-use building (containing a ground floor commercial unit and ten residential dwelling units) by converting the existing storage space into three new residential dwelling units (two dwelling units in the basement, and one dwelling unit on the ground level). The existing 12 long-term bicycle parking spaces and 4 short-term bicycle parking spaces will be maintained and unaltered. There will be a total of 13 residential dwelling units on this lot.

    180 m away · filed Oct 20, 2025 · Approved

  • 94 St Clarens Ave · Minor variance

    To construct a new two-storey ancillary building (including a basement walkout with one laneway suite), in the rear yard, abutting the laneway. The second storey will be cantilevered on the south side.

    90 m away · filed Jun 30, 2025 · Refused

  • 163 St Clarens Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front ground floor landing with stairs, a side (north) ground floor walkout, two rear ground floor landings with stairs and two third floor side (north) terraces (Unit A and Unit C). Also, to construct a new two-storey laneway suite in the rear yard with a front (west) second floor terrace. There will be a total of five dwelling units on the lot (four units within the main dwelling and one unit within the laneway suite). The existing rear detached garage will be demolished.

    230 m away · filed May 13, 2025 · Approved

  • 33 St Clarens Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing one residential unit within the basement, a new front porch with stairs and canopy, and a front basement walkout. There will be a total of two residential dwelling units on this lot. The existing rear one-storey ancillary building (garage) will be maintained and unaltered.

    190 m away · filed Feb 7, 2025 · Approved

  • 66 St Clarens Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front deck. Also, to construct rear one and three-storey additions with a ground level deck and stairs.

    120 m away · filed Jan 13, 2025 · Approved

  • 27 Northern Pl · Minor variance

    To alter the existing two-storey semi-detached townhouse dwelling by constructing a complete third storey addition.

    200 m away · filed Jun 15, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.