Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

46 Martin Grove Rd

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Pool fence enclosure

    Proposal to install a pool fence enclosure

    Applied Apr 3, 2019 · issued Apr 9, 2019 · completed Apr 9, 2019 · Permit 19 134627 BLD

    Closed
  • Heating and ventilation

    HVAC - Construct a new two storey single family dwelling (335.75m2) with attached garage and finsihed basement (120m2). Demolish existing dwelling

    Applied Apr 28, 2016 · issued May 12, 2016 · completed Mar 15, 2018 · Permit 16 104844 HVA

    Closed
  • Plumbing

    Plumbing - Construct a new two storey single family dwelling (335.75m2) with attached garage and finsihed basement (120m2). Demolish existing dwelling

    Applied Jan 15, 2016 · issued Jan 29, 2016 · completed Mar 15, 2018 · Permit 16 104844 PLB

    Closed
  • New house · New building

    Construct a new two storey single family dwelling (335.75m2) with attached garage and finsihed basement (120m2). Demolish existing dwelling

    Applied Jan 15, 2016 · issued Jan 29, 2016 · completed Mar 27, 2018 · 1 home added · Permit 16 104844 BLD

    Closed
  • Demolition

    Demolish existing dwelling to construct a new two storey single family dwelling

    Applied Jan 15, 2016 · issued Jan 29, 2016 · completed Mar 19, 2018 · 1 home removed · Permit 16 104851 DEM

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 3925-3927 Bloor Street West

    6 storeys · 52 homes · Residential

    410 m away · Site plan · Under review · filed Dec 29, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 58 Charleston Rd · Minor variance

    To construct a second storey rear addition.

    130 m away · filed May 19, 2026 · Approved

  • 37 Fairlin Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed May 19, 2026 · Approved

  • 39 Charleston Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed Dec 5, 2025 · Approved

  • 58 Shaver Ave N · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed Nov 21, 2025 · Approved

  • 17 Rockfield Dr · Minor variance

    To constuct a new detached dwelling with an attached garage.

    80 m away · filed Feb 19, 2025 · Approved

  • 46 Charleston Rd · Minor variance

    To construct three storey additions along the north and west side of the existing dwelling, a second and third storey addition above the existing dwelling and to convert the existing dwelling into a triplex. The existing attached garage will be demolished.

    110 m away · filed Oct 23, 2024 · Application withdrawn

  • 46 Charleston Rd · Minor variance

    To construct three storey additions along the north and west side of the proposed fourplex and a second and third floor addition above the existing dwelling. The existing attached garage will be demolished.

    110 m away · filed May 21, 2024 · Withdrawn

  • 62 Martin Grove Rd · Minor variance

    To construct a two-storey rear addition and a second storey addition above the existing dwelling. A previous Committee of Adjustment application (A0574/21EYK) approved variances relating to floor space index and dwelling depth.

    110 m away · filed Nov 24, 2022 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.