Toronto address · Ward 5, York South-Weston
46 Portage Ave
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev 01Construct a rear addition (36.68m2), a second floor addition (123.76m2), basment walkout, rear deck and a roof over existing front porch, and to demolish existing detached garage and rebuild new detached garage.
Applied Jul 31, 2017 · issued Aug 15, 2017 · Permit 16 193471 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Construct a rear addition (36.68m2), a second floor addition (123.76m2), basment walkout, rear deck and a roof over existing front porch, and to demolish existing detached garage and rebuild new detached garage.
Applied Mar 8, 2017 · issued Mar 30, 2017 · completed Jan 22, 2018 · Permit 16 193471 HVA
- Inspections under way
Plumbing
Plumbing - Construct a rear addition (36.68m2), a second floor addition (123.76m2), basment walkout, rear deck and a roof over existing front porch
Applied Jul 19, 2016 · issued Oct 14, 2016 · Permit 16 193471 PLB
- Inspections under way
Small residential project · Multiple projects
Construct a rear addition (36.68m2), a second floor addition (123.76m2), basment walkout, rear deck and a roof over existing front porch, and to demolish existing detached garage and rebuild new detached garage.
Applied Jul 19, 2016 · issued Oct 14, 2016 · Permit 16 193471 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
59 Langside Ave · Minor variance
To construct a second storey addition above the existing dwelling, a covered front porch, and a deck in the rear yard.
250 m away · filed Aug 20, 2026 · Hearing scheduled
194 Gary Dr · Minor variance
To construct a new garden suite in the rear yard.
220 m away · filed Feb 13, 2026 · Approved
20 Portage Ave · Minor variance
To construct a second storey addition above the existing dwelling and a new covered front porch. The existing detached garage in the rear yard will be maintained.
160 m away · filed Sep 20, 2022 · Approved
17 Wendell Ave · Minor variance
To construct a one-storey front and rear addition, a new front porch and a rear yard deck. A previous Committee of Adjustment application (A0039/22EYK) approved variances relating to front yard setback, side yard setback, building length, first floor height, exterior stairs providing pedestrian access and driveway width.
240 m away · filed Jun 17, 2022 · Approved
27 Portage Ave · Minor variance
To construct a new detached dwelling with an attached garage.
120 m away · filed Feb 8, 2022 · Approved
17 Wendell Ave · Minor variance
To construct a one-storey front and rear addition, a new front porch and a rear yard deck.
240 m away · filed Jan 18, 2022 · Approved
7 Ranwood Dr · Minor variance
To construct a second storey addition, two-storey rear and south side additions and a new rear deck.
230 m away · filed Nov 29, 2021 · Approved
29 Ranwood Dr · Minor variance
To construct a new detached dwelling with an attached garage.
150 m away · filed Oct 21, 2021 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.