Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

46 Shaftesbury Ave

The City of Toronto has 23 building permits since 2017 (13 still open) and 4 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Site service

    Proposal 3/4"0 type 'k' soft prevention copper water device. Service, 4"0 pvc sanitary lateral@ 1.0% & prop. Water, site meter and services backflowpermit

    Applied Jul 22, 2026 · Permit 26 206897 STS

    Ready for issuance
  • Heating and ventilation

    HVAC - Proposal to construct a 3-storey detached dwelling with finished basement.

    Applied May 26, 2026 · Permit 16 137892 HVA

    Ready for issuance
  • New house · New building

    REVISION 2 - revision to the basement and third floor layout, remove the car lift, removal of in-floor heating on main, second and third floors

    Applied May 26, 2026 · Permit 16 137892 BLD (revision 02)

    Examiner's notice sent
  • Heating and ventilation

    Rev 01: To accommodate architectural changesHVAC - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Aug 16, 2023 · issued Oct 26, 2023 · completed Jun 16, 2025 · Permit 16 137654 HVA (revision 01)

    Closed
  • Heating and ventilation

    Revision 01: revision to HVACHVAC - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Aug 14, 2023 · issued Dec 15, 2023 · Permit 16 137877 HVA (revision 01)

    Revision issued
  • Plumbing

    Revision 02: plumbing revisionREV 01 - PLUMBING- Proposed changes to all floors.Plumbing - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Aug 14, 2023 · issued Aug 14, 2023 · completed Jun 14, 2025 · Permit 16 137654 PLB (revision 02)

    Closed
  • Plumbing

    revision 01: plumbing revisionPlumbing - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Aug 14, 2023 · issued Aug 14, 2023 · Permit 16 137877 PLB (revision 01)

    Revision issued
  • Plumbing

    REV 01 - PLUMBING- Proposed changes to all floors.Plumbing - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Sep 19, 2022 · issued Sep 20, 2022 · completed Jun 14, 2025 · Permit 16 137654 PLB (revision 01)

    Closed
  • New house · New building

    REV 01: Proposal for multiple changes to all floors. Proposal to construct 3-storey semi-detached dwelling with finished basement. (Refer to building permit 16 137877 BLD 00 NH for adjacent Semi.)

    Applied Sep 19, 2022 · issued Dec 19, 2023 · Permit 16 137654 BLD (revision 01)

    Revision issued
  • New house · New building

    REVISION - changes to interior layout, new windows with sprinklers, decrease the footprint reducing the GFAProposal to construct 3-storey semi-detached dwelling with finished basement. (Refer to building permit 16 137654 BLD 00 NH for adjacent Semi.)

    Applied Sep 22, 2021 · issued Dec 19, 2023 · Permit 16 137877 BLD (revision 01)

    Revision issued
  • New house · New building

    Revision - main floor was shifted up 3" (1.5" reduced from the main floor, 1.5" reduced from the third floor) - all building heights remained unchanged

    Applied Dec 2, 2020 · issued Mar 19, 2021 · Permit 16 137892 BLD (revision 01)

    Revision issued
  • Conditional permit · New building

    Conditional Permit - Proposal to construct 3-storey semi-detached dwelling with finished basement. (Refer to building permit 16 137877 BLD 00 NH for adjacent Semi.)

    Applied Jul 19, 2019 · issued Aug 20, 2019 · completed Mar 30, 2020 · Permit 16 137654 BLD

    Cancelled
Show 11 more permits
  • Conditional permit · New building

    Conditional Permit - Proposal to construct a 3-storey detached dwelling with finished basement.

    Applied Jul 19, 2019 · issued Aug 20, 2019 · completed Mar 30, 2020 · Permit 16 137892 BLD

    Cancelled
  • Conditional permit · New building

    Conditional Permit - Proposal to construct 3-storey semi-detached dwelling with finished basement. (Refer to building permit 16 137654 BLD 00 NH for adjacent Semi.)

    Applied Jul 19, 2019 · issued Aug 20, 2019 · completed Mar 30, 2020 · Permit 16 137877 BLD

    Closed
  • Drains and site services

    Drain - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · completed Jun 14, 2025 · Permit 16 137654 DRN

    Closed
  • Drains and site services

    Drain - Proposal to construct a 3-storey detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · Permit 16 137892 DRN

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · Permit 16 137877 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a 3-storey detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · Permit 16 137892 PLB

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · Permit 16 137877 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Oct 27, 2022 · Permit 16 137877 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Sep 22, 2022 · completed Jun 16, 2025 · Permit 16 137654 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct 3-storey semi-detached dwelling with finished basement.

    Applied Apr 8, 2016 · issued Aug 20, 2019 · completed Jun 14, 2025 · Permit 16 137654 PLB

    Closed
  • Demolition

    Proposal to demolish existing industrial stone cutting shed.

    Applied Apr 8, 2016 · issued Sep 5, 2018 · completed Jun 10, 2020 · Permit 16 137921 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent to sever the property into three residential lots and to create a servicing easement/right-of-way.

    Decision: Refused (hearing Nov 2, 2016)

    Filed Aug 15, 2016 · 3 new lots · Appeal: OMB approved · File B0057/16TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling.

    Decision: Refused (hearing Nov 2, 2016)

    Filed Aug 15, 2016 · Appeal: OMB approved · File A0819/16TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling.

    Decision: Refused (hearing Nov 2, 2016)

    Filed Aug 15, 2016 · Appeal: OMB approved · File A0820/16TEY

    Closed
  • Minor variance · New R building

    To construct a new three-storey detached dwelling with an integral garage.

    Decision: Refused (hearing Nov 2, 2016)

    Filed Aug 15, 2016 · Appeal: OMB approved · File A0821/16TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 1212-1220 Yonge Street

    22 storeys · 185 homes · Mixed use

    210 m away · Site plan · Under review · filed Aug 31, 2022

    Under review
  • 1196-1210 Yonge Street

    14 storeys · 67 homes · Mixed use

    210 m away · Condominium · Under review · filed Nov 18, 2021

    Under review
  • 9 Woodlawn Avenue East and 1233 Yonge Street

    49 storeys · 724 homes · Mixed use

    230 m away · Site plan · Under review · filed Dec 29, 2021

    Under review
  • 44 Price Street

    2 storeys · Not stated in the file

    230 m away · Site plan · Approved · filed Aug 19, 2025

    Approved
  • 1251-1311 Yonge Street

    47 storeys · 832 homes · Mixed use

    290 m away · Site plan · Under review · filed Apr 12, 2022

    Under review
  • 49 Jackes Avenue

    217 homes · Residential

    320 m away · Condominium · Under review · filed Nov 4, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 67 Summerhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.

    120 m away · filed Jul 29, 2026 · Hearing scheduled

  • 1262 Yonge St · Minor variance

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    250 m away · filed Apr 23, 2026 · Approved

  • 5 Scrivener Sq · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 267-2021 (LPAT), for the 23-storey mixed-use building (currently under construction) by constructing a one-storey addition (enclosed solarium / patio) for the use of the eating establishment (restaurant), by increasing the total gross floor area, the horizontal patio projection, and building heights (the enclosed solarium/patio will have a height of 4.6 m). Also to reduce the north building setback from 5.9 m to 4.35 m, the south building separation distance from 5.5 m to 2.58 m, and to alter the location of the…

    230 m away · filed Feb 9, 2026 · Approved

  • 1177 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the seven-storey mixed-use condominium building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1, P2, and P3 will be maintained and unaltered. There will be a total of 182 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    150 m away · filed Sep 2, 2025 · Approved

  • 1133 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey commercial building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 40 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    140 m away · filed Jul 11, 2025 · Approved

  • 1155 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the six-storey office building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1 and P2 will be maintained and unaltered. There will be a total of 47 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    130 m away · filed Jul 11, 2025 · Approved

  • 49 Woodlawn Ave E · Minor variance

    To legalize and to maintain the rear ground floor deck, which was constructed without an authorized building permit.

    200 m away · filed Dec 27, 2024 · Approved

  • 38 Mathersfield Dr · Minor variance

    To permit the existing two-storey ancillary building (detached garage abutting the laneway), by constructing a mezzanine on the second level. The existing ancillary structure (storage shed) attached to the detached garage will be maintained.

    140 m away · filed Sep 25, 2024 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.