Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

463 St Clements Ave

The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to new underpinning at old section fo existing dwelling, changes to basement insulation and attic roof rafters, R/I basement washroom and replce existing stair Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Apr 22, 2026 · issued Jun 1, 2026 · Permit 23 237220 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Apr 22, 2026 · issued May 7, 2026 · Permit 23 237220 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Mar 6, 2026 · issued Apr 1, 2026 · Permit 23 237220 HVA

    Permit issued
  • Drains and site services

    Drain - Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Dec 19, 2023 · issued Dec 23, 2024 · Permit 23 237220 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Dec 19, 2023 · issued Dec 23, 2024 · Permit 23 237220 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a 2-storey rear addition, interior alterations and rear deck.

    Applied Dec 19, 2023 · issued Dec 23, 2024 · Permit 23 237220 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 424 Castlefield Ave · Minor variance

    130 m away · filed Sep 16, 2026 · Accepted

  • 136 Heddington Ave · Minor variance

    To alter the existing front yard landscaping area.

    240 m away · filed Jul 30, 2026 · Hearing scheduled

  • 493 Castlefield Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial second storey addition above the garage.

    140 m away · filed Dec 17, 2025 · Approved

  • 87 Hillhurst Blvd · Minor variance

    To construct a new detached dwelling with an integral garage. Note: This application was previously deferred at the Committee of Adjustment hearing on October 9, 2025.

    230 m away · filed Aug 29, 2025 · Approved

  • 483 St Clements Ave · Minor variance

    To construct a new two-storey detached dwelling with a front porch, rear deck, and basement walkout. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 6, 2025.

    80 m away · filed Aug 25, 2025 · Approved

  • 483 St Clements Ave · Minor variance

    To construct a new two-storey detached dwelling with a front porch and a rear deck.

    80 m away · filed Jun 30, 2025 · Approved

  • 435 Castlefield Ave · Minor variance

    To construct a new two-storey detached dwelling with a front porch, rear deck and rear basement walkout. Also proposed is an in-ground swimming pool in the rear yard. Cross-reference previous Minor Variance Application A0040/24NY.

    110 m away · filed Aug 28, 2024 · Approved

  • 536 Roselawn Ave · Minor variance

    To construct a two-storey addition to the rear of the existing dwelling in conjunction with other interior and exterior alterations.

    160 m away · filed May 3, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.