Toronto address · Ward 14, Toronto-Danforth
465 Leslie St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
To install 1 Backflow Prevention Devices (Water only).
Applied Aug 4, 2023 · issued Sep 6, 2023 · completed Jan 10, 2024 · Permit 23 184666 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
53 Hunter St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition and a new rear first storey deck with stairs.
240 m away · filed Mar 31, 2026 · Approved
55 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 55 Harriet Street. This will in…
190 m away · filed Jun 13, 2025 · Approved
53 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 53 Harriet Street. This will in…
180 m away · filed Jun 13, 2025 · Approved
57 Harriet St · Minor variance
To legalize and to maintain a new three-storey 12-unit apartment building that will span over 3 lots (municipally known as 53, 55, and 57 Harriet Street). This apartment building will contain a total of 4 residential dwellings units on each lot, with front porches, front basement walkouts, front and rear third storey balconies, and rear ground level decks. This building is currently under construction, beyond the limits of the authorized building permit(s). Also, there will be a two-storey ancillary building containing one laneway suite, abutting the laneway at 57 Harriet Street. This will in…
190 m away · filed Jun 13, 2025 · Approved
33 Prust Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition (enclosing the existing second storey deck for habitable space).
160 m away · filed Oct 28, 2024 · Approved
19 Seymour Ave · Minor variance
To construct a new three-storey detached dwelling with a front third storey balcony, a front basement walkout, and a front porch. Also, to reconstruct the rear ground floor deck with stairs and construct a green roof on the partial cover of the deck.
180 m away · filed Jan 3, 2024 · Approved
17 Boothroyd Ave · Minor variance
To construct a new three-storey detached dwelling.
230 m away · filed Nov 21, 2023 · Approved
17 Boothroyd Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
230 m away · filed Nov 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.