Toronto address · Ward 13, Toronto Centre
466 King St E
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Party wall admin permits
Party wall admin permit for work at 464 king st east
Applied May 6, 2023 · issued Oct 13, 2023 · Permit 23 142482 BLD
- Inspections under way
Small residential project · Interior alterations
Remove existing secondary kitchen facility from basement floor area and make interior structural alterations in basement floor area and ground floor area.
Applied Mar 18, 2003 · issued Mar 18, 2003 · Permit 03 115605 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
120 m away · Site plan · Under review · filed Oct 21, 2025
- Under review
15 storeys · 151 homes · Residential
130 m away · Condominium · Under review · filed Nov 8, 2021
- Submitted
20 storeys · 297 homes · Residential
290 m away · Site plan · Submitted · filed Apr 16, 2026
- Under review
43 storeys · 997 homes · Residential
300 m away · Site plan · Under review · filed Mar 23, 2023
- Approved
80-94 Power Street, 351-373 Queen Street East and 161-167 Parliament Street
28 storeys · 526 homes · Mixed use
390 m away · Site plan · Approved · filed Jun 28, 2021
- Under review
31 storeys · 859 homes · Mixed use
460 m away · Site plan · Under review · filed Apr 25, 2022
Neighbours’ Committee of Adjustment files within 250 m
498 Queen St E · Minor variance
To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.
170 m away · filed Mar 7, 2025 · Deferred
90 Sumach St · Minor variance
To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.
220 m away · filed Sep 27, 2024 · Approved
29 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.
160 m away · filed Jun 6, 2024 · Approved
90 Sumach St · Minor variance
To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.
220 m away · filed Jan 5, 2024 · Refused
90 Sumach St · Minor variance
To legalize and to maintain the residential rooftop terrace enclosure (unit 702 in the seven-storey mixed-use building) which was constructed without an authorized building permit.
220 m away · filed Nov 29, 2023 · Approved
1 Ashby Pl · Minor variance
To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.
120 m away · filed Aug 30, 2023 · Approved
97 Sumach St · Minor variance
To convert the existing three-storey townhouse from one unit into two units by installing a secondary suite within the basement and by constructing: a two storey rear addition; a partial third storey addition with a rear third storey roof terrace; a new front porch with stairs and a canopy; and a new rear basement walkout. Also, to construct an ancillary building (detached shed) in the rear yard of the property, abutting the laneway.
230 m away · filed Feb 28, 2022 · Approved
90 Sumach St · Minor variance
To permit the existing balcony/terrace on the existing apartment building.
220 m away · filed Feb 7, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.