Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

469 Deloraine Ave

The City of Toronto has 7 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Rev 01 - Revision applicationHVAC - Proposed new two storey single family dwelling with attched garage.

    Applied Jun 11, 2024 · issued Jul 3, 2024 · Permit 23 136587 HVA (revision 01)

    Revision issued
  • New house · New building

    Revision - Interior modifications to all floors, addition of a rear basement walkout

    Applied Jan 4, 2024 · issued Jun 27, 2024 · Permit 23 136587 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed new two storey single family dwelling with attched garage.

    Applied Dec 12, 2023 · issued Jan 26, 2024 · Permit 23 136587 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed new two storey single family dwelling with attched garage.

    Applied Apr 21, 2023 · issued May 29, 2023 · Permit 23 136587 PLB

    Inspections under way
  • New house · New building

    Proposed new two storey single family dwelling with attched garage.

    Applied Apr 21, 2023 · issued May 29, 2023 · 1 home added · Permit 23 136587 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposed new two storey single family dwelling with attched garage.

    Applied Apr 21, 2023 · issued May 30, 2023 · Permit 23 136587 DRN

    Inspections under way
  • Demolition

    Demolition of the existing single family dwelling.

    Applied Apr 21, 2023 · issued May 29, 2023 · completed Jul 22, 2026 · Permit 23 136596 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    Proposal to construct a new two storey single family detatched dwelling with integral garage.

    Decision: Approved (hearing Aug 11, 2022)

    Filed May 16, 2022 · File A0358/22NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 401 Melrose Ave · Minor variance

    To alter the existing detached dwelling by constructing a third storey addition, in conjunction with a front addition, a new front porch and a rear deck.

    200 m away · filed Jun 4, 2026 · Approved

  • 440 Melrose Ave · Minor variance

    To construct an ancillary structure (cabana) in the rear yard.

    70 m away · filed Mar 4, 2026 · Approved

  • 387 Melrose Ave · Minor variance

    To construct a new detached dwelling and a garden suite.

    220 m away · filed Sep 18, 2025 · Approved

  • 481 Old Orchard Grv · Minor variance

    To construct a new detached dwelling with an integral garage.

    100 m away · filed Jun 18, 2025 · Approved

  • 403 Melrose Ave · Minor variance

    To construct a second storey addition to the existing dwelling in conjunction with other interior and exterior alterations.

    190 m away · filed Apr 7, 2025 · Approved

  • 132 Grey Rd · Minor variance

    To Construct a New Three Storey Detached Dwelling with an attached garage.

    210 m away · filed Mar 26, 2025 · Approved

  • 440 Melrose Ave · Minor variance

    To construct a new two-storey detached dwelling.

    70 m away · filed Feb 12, 2025 · Approved

  • 496 Melrose Ave · Minor variance

    To construct a new dwelling with a rear deck and balcony.

    240 m away · filed Nov 27, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.