Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

47 Front St E

The City of Toronto has 20 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign displaying stati ccopy on the first and second storey of the northerly elevation, measuring 3.66 m by 0.66 m at a height of 5.23 m, and one non-illuminated projecting sign displaying static copy located on the first storey of the northerly elevation, measuring 0.61m by 1.0 m. *****FRESH************PLANT POWERED*******

    Applied Jul 16, 2018 · issued Oct 17, 2018 · completed Nov 20, 2018 · Permit 18 194797 DST

    Closed
  • Heating and ventilation

    REVISION - updated floor layout including kitchen and washroom location changesHVAC - Proposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied May 29, 2018 · issued Jun 28, 2018 · completed Sep 10, 2018 · Permit 17 279956 HVA (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REVISION - updated floor layout including kitchen and washroom location changesProposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied May 29, 2018 · issued Jul 9, 2018 · completed Aug 9, 2018 · Permit 17 279956 BLD (revision 01)

    Closed
  • Plumbing

    REVISION - updated floor layout including kitchen and washroom location changesPlumbing - Proposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied May 29, 2018 · issued Jun 28, 2018 · completed Aug 15, 2018 · Permit 17 279956 PLB (revision 01)

    Closed
  • Heating and ventilation · Alter: add on /Ductwork

    Proposal to install ductwork for fourth floor from supply trunks.

    Applied May 11, 2018 · issued May 30, 2018 · Permit 18 157344 MSA

    Inspections under way
  • Heating and ventilation · Alter: add on /Ductwork

    Proposal to install ductwork in basemen of existing office building.

    Applied Mar 16, 2018 · issued Apr 13, 2018 · Permit 18 130228 MSA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied Dec 28, 2017 · issued Mar 1, 2018 · completed Aug 15, 2018 · Permit 17 279956 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied Dec 28, 2017 · issued Mar 1, 2018 · completed Sep 10, 2018 · Permit 17 279956 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for tenant fit out of a new restaurant greater than 30 seats on the ground floor of the existing commercial building, scope of work includes HVAC and Plumbing.

    Applied Dec 28, 2017 · issued Mar 1, 2018 · completed Aug 9, 2018 · Permit 17 279956 BLD

    Closed
  • Addition or alteration · Interior alterations

    Rev 01 - minor interior layout changes Change of use to A2 (restaurant) from E (retail) on ground floor. Proposal for interior alterations to existing lobby entrance, new basement exit stair and fire rate rear exit stair & basement demolition of non load bearing partition walls.

    Applied Nov 20, 2017 · issued Dec 19, 2017 · completed May 24, 2018 · Permit 17 189612 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing lobby entrance, new basement exit stair and fire rate rear exit stair & basement demolition of non load bearing partition walls. New ductwork in basement.

    Applied Oct 26, 2017 · issued Nov 23, 2017 · Permit 17 189612 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Change of use to A2 (restaurant) from E (retail) on ground floor. Proposal for interior alterations to existing lobby entrance, new basement exit stair and fire rate rear exit stair & basement demolition of non load bearing partition walls.

    Applied Jun 29, 2017 · issued Aug 11, 2017 · completed May 24, 2018 · Permit 17 189612 BLD

    Closed
Show 8 more permits
  • Plumbing

    Plumbing - Proposal to construct interior alterations (new interior walls and washrooms) to second floor tenant fit-up

    Applied May 24, 2017 · issued Jun 5, 2017 · completed Jan 8, 2018 · Permit 17 165232 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations (new interior walls and washrooms) to second floor tenant fit-up

    Applied May 24, 2017 · issued Jun 5, 2017 · completed Feb 16, 2018 · Permit 17 165232 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations (new interior walls and washrooms) to second floor tenant fit-up

    Applied May 24, 2017 · issued Jun 5, 2017 · completed Feb 2, 2018 · Permit 17 165232 HVA

    Closed
  • Heating and ventilation · Other

    Revision # 01 - To install ductwork to the 3rd floor.Proposal for the rough in of 5 a/c units for heating and cooling for future tenants. Units will be used for office and restaurant.

    Applied Apr 28, 2017 · issued Oct 16, 2017 · Permit 17 108832 MSA (revision 01)

    Revision issued
  • Fire and security upgrade · Fire alarm

    Proposed installation of fire alarm system.

    Applied Apr 19, 2017 · issued May 19, 2017 · completed May 24, 2018 · Permit 17 145780 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal for minor alterations for new mechanical roof top unit equipment and base building structural reinforcement related to permit 17-108832 MSA

    Applied Apr 4, 2017 · issued Apr 27, 2017 · completed May 15, 2017 · Permit 17 139181 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to demolish a convenience stair between 1st and 2nd floors and build a new floor to match existing.

    Applied Jan 30, 2017 · issued Feb 14, 2017 · completed May 15, 2017 · Permit 17 110522 BLD

    Closed
  • Heating and ventilation · Other

    Proposal for the rough in of 5 a/c units for heating and cooling for future tenants. Units will be used for office and restaurant.

    Applied Jan 25, 2017 · issued Mar 13, 2017 · Permit 17 108832 MSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 45 The Esplanade

    39 storeys · 630 homes · Mixed use

    160 m away · Site plan · Approved · filed Dec 29, 2021

    Approved
  • 49-51 Yonge Street

    60 storeys · 256 homes · Mixed use

    240 m away · Condominium · Under review · filed Nov 8, 2021

    Under review
  • 53-55 Yonge Street

    68 storeys · 836 homes · Residential

    240 m away · Rezoning · Under review · filed Oct 21, 2024

    Under review
  • 53-55 Yonge Street

    66 storeys · 511 homes · Mixed use

    240 m away · Site plan · Under review · filed Apr 27, 2022

    Under review
  • 56-60 Yonge Street

    65 storeys · 649 homes · Mixed use

    290 m away · Site plan · Under review · filed Apr 7, 2025

    Under review
  • 1-3 King Street East and 69-71 Yonge Street

    15 storeys · 127 homes · Residential

    290 m away · Site plan · Under review · filed Nov 7, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 20 Wellington St E · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition and to create new easements/rights-of-ways (some stratified).

    180 m away · filed Apr 16, 2025 · Approved

  • 71 King St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on…

    200 m away · filed Aug 26, 2024 · Approved

  • 17 Leader Lane · Minor variance

    To alter the existing three-storey commercial building by constructing a complete fourth storey addition.

    170 m away · filed Aug 30, 2021 · Approved

  • 80 Front St E · Minor variance

    APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.

    200 m away · filed Dec 12, 2019 · Withdrawn

  • 55 Yonge St · Minor variance

    To convert vacant office space into a medical/dental office on the ground floor of the existing twelve-storey commercial and retail building.

    240 m away · filed Jul 31, 2019 · Approved

  • 46 Colborne St · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition and to create various easements/rights-of-way. This application is associated with consent applications B0036/18TEY, B0037/18TEY, B0039/18TEY and B0040/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.

    150 m away · filed Jun 20, 2018 · Approved

  • 91 King St E · Consent

    To obtain consent to re-establish an easement/right-of-way.

    190 m away · filed Jun 20, 2018 · Approved

  • 95 King St E · Consent

    To obtain consent to re-establish an easement/right-of-way.

    190 m away · filed Jun 20, 2018 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.