Toronto address · Ward 13, Toronto Centre
47 Rose Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Fire and security upgrade · Fire alarm
Proposal to replace the fire alarm control panel and remote annunciator in the existing building.
Applied Aug 13, 2020 · issued Sep 10, 2020 · completed Dec 23, 2020 · Permit 20 180314 FSU
- Cancelled
Small residential project · Multiple projects
To combine both sides of existing semi-detached building into one building on one lot. The 6 dwelling units existing within both 45 & 47 Rose Avenue are to remain.Constructing an addition at the third storey for a new exit stair, 2 new roof decks at the third storey, Reconstruct porch and balcony at the front, and interior alterations throughout.(Toronto Community Housing)
Applied Oct 10, 2014 · completed Jul 25, 2017 · Permit 14 236126 BLD
- Closed
Fire and security upgrade · Fire alarm
Install fire alarm and fire separations to rear private storage building on same land as 47 rose ave. converted house. HISTORICAL
Applied Dec 4, 2001 · issued Dec 21, 2001 · completed Sep 1, 2026 · Permit 01 199873 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
210 m away · Site plan · Under review · filed Apr 27, 2022
- Under appeal
10 storeys · 60 homes · Mixed use
340 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Submitted
- Approved
41 storeys · 460 homes · Mixed use
420 m away · Rezoning · Approved · filed Aug 25, 2025
- Under review
39 storeys · 456 homes · Mixed use
450 m away · Condominium · Under review · filed Nov 8, 2021
- Under appeal
39 storeys · 378 homes · Residential
460 m away · Site plan · Under appeal · filed Jul 6, 2023
Neighbours’ Committee of Adjustment files within 250 m
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
110 m away · filed Jul 18, 2024 · Approved
37 Winchester St · Consent
To sever the existing lot into two lots and to create a new easement.
230 m away · filed May 11, 2023 · Approved
41 Rose Ave · Consent
To obtain consent for a technical severance to re-establish two residential lots which merged on title.
20 m away · filed Dec 22, 2022 · Approved
7 Rose Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
180 m away · filed May 19, 2022 · Approved
40 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse by constructing a rear one-storey addition and a complete third storey addition, with a balcony, above the existing rear two-storey addition. The existing rear yard parking pad will be maintained, abutting the laneway (Mickey Lane).
240 m away · filed Oct 8, 2021 · Approved
18 Laurier Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.
240 m away · filed Aug 11, 2021 · Approved
8 Amelia St · Minor variance
To alter the existing two-storey mixed-use building by constructing a complete third storey addition.
120 m away · filed Aug 6, 2021 · Approved
19 Amelia St · Minor variance
To remove the detached garage in the rear yard of the existing one-storey detached dwelling.
180 m away · filed May 11, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.