Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 24, Scarborough-Guildwood

475 Brimorton Dr

The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    revision 01: proposal to revise basement layoutProposed construction includes the addition of a second floor, along with an extension of the first floor and basement, as well as interior alterations, a front covered porch and balcony.

    Applied Mar 4, 2026 · issued May 5, 2026 · Permit 25 227320 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    revision 01: proposal to revise basement layoutHVAC - Proposed construction includes the addition of a second floor, along with an extension of the first floor and basement, as well as interior alterations, a front covered porch and balcony.

    Applied Mar 4, 2026 · issued May 8, 2026 · Permit 25 227320 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed construction includes the addition of a second floor, along with an extension of the first floor and basement, as well as interior alterations, a front covered porch and balcony.

    Applied Sep 18, 2025 · issued Dec 17, 2025 · Permit 25 227320 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposed construction includes the addition of a second floor, along with an extension of the first floor and basement, as well as interior alterations, a front covered porch and balcony.

    Applied Sep 18, 2025 · issued Dec 16, 2025 · Permit 25 227320 PLB

    Permit issued
  • Small residential project · Multiple projects

    Proposed construction includes the addition of a second floor, along with an extension of the first floor and basement, as well as interior alterations, a front covered porch and balcony.

    Applied Sep 18, 2025 · issued Dec 16, 2025 · Permit 25 227320 BLD

    Inspections under way
  • Drains and site services · Back water valve (Sewer only)

    Install BWV

    Applied Jul 28, 2022 · issued Aug 2, 2022 · completed Aug 10, 2022 · Permit 22 183544 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by replacing the existing front covered porch and constructing a full second storey addition, a partial side (east) two-storey addition, a rear two-storey addition, and a front second storey balcony. The existing ground floor deck will be demolished.

    Decision: Approved (hearing Jul 9, 2025)

    Filed Apr 29, 2025 · File A0110/25SC

    Closed

What’s planned nearby

Development sites within 500 m

  • 1050 Markham Road

    37 storeys · 438 homes · Residential

    410 m away · Rezoning · Under review · filed Jul 3, 2024

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 50 Dolly Varden Blvd · Minor variance

    To construct a side garage addition to existing dwelling.

    140 m away · filed Feb 22, 2023 · Approved

  • 67 Dolly Varden Blvd · Minor variance

    To modify soft landscape area in front yard to accommodate parking for additional car.

    220 m away · filed Mar 26, 2021 · Approved

  • 465 Brimorton Dr · Minor variance

    To construct a two-storey rear addition and a full second storey addition over the existing dwelling.

    70 m away · filed Jan 12, 2021 · Approved

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.