Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

483 Hopewell Ave

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 2nd floor addition, interior alterations to the ground floor, front porch, rear deck, a basement walkout and a new detached garage. See also 14 246758 ZZC and the OMB decision.

    Applied Dec 6, 2016 · issued Dec 19, 2016 · Permit 16 119559 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 2nd floor addition, interior alterations to the ground floor, front porch, rear deck, a basement walkout and a new detached garage. See also 14 246758 ZZC and the OMB decision.

    Applied Feb 23, 2016 · issued Jun 8, 2016 · Permit 16 119559 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 2nd floor addition, interior alterations to the ground floor, front porch, rear deck, a basement walkout and a new detached garage. See also 14 246758 ZZC and the OMB decision.

    Applied Feb 23, 2016 · issued Jun 8, 2016 · Permit 16 119559 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 2nd floor addition, interior alterations to the ground floor, front porch, rear deck, a basement walkout and a new detached garage. See also 14 246758 ZZC and the OMB decision.

    Applied Feb 23, 2016 · issued Jun 8, 2016 · Permit 16 119559 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 222 Belgravia Ave · Minor variance

    To construct a new 3 storey detached fourplex, with a Garden Suite at the rear of the property.

    150 m away · filed Nov 14, 2025 · Approved

  • 485 Hopewell Ave · Minor variance

    Proposal to reduce the landscaping requirement at the rear yard

    10 m away · filed Jan 30, 2024 · Approved

  • 485 Hopewell Ave · Minor variance

    Proposed brick and block garage at the rear.

    10 m away · filed Jul 22, 2023 · Approved

  • 487 Whitmore Ave · Minor variance

    Proposal to construct new three storey dwelling with front porch and detached garage.

    90 m away · filed Dec 29, 2022 · Refused

  • 468 Whitmore Ave · Minor variance

    To construct a second storey and two-storey addition to the existing dwelling, in conjunction with other interior and exterior alterations.

    70 m away · filed Oct 9, 2021 · Approved

  • 459 Hopewell Ave · Minor variance

    To add a dwelling unit to the existing dwelling. The application was deferred on March 5, 2020 in order to allow the applicant to meet with the Transportation Department to discuss their concerns.

    110 m away · filed Jan 7, 2020 · Approved

  • 439 Hopewell Ave · Minor variance

    To construct a new dwelling.

    190 m away · filed May 13, 2019 · Approved

  • 487 Hopewell Ave · Minor variance

    To construct an addition to the rear of the existing dwelling.

    20 m away · filed May 7, 2019 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.