Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

483 Russell Hill Rd

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied Dec 23, 2022 · issued Dec 23, 2022 · completed Jan 10, 2023 · Permit 22 242111 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 242 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling (including a basement extension below with a walkout), with an integral garage, a front covered porch with stairs and a rear covered patio platform. Also, a new front driveway will be constructed on the east side of the lot. The existing detached garage will be demolished.

    140 m away · filed Jul 21, 2025 · Approved

  • 238 Forest Hill Rd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey front addition to the existing attached garage, and a rear second storey addition.

    150 m away · filed May 12, 2025 · Approved

  • 62 Hillholm Rd · Minor variance

    To construct a new three-storey detached dwelling with a two-car integral garage, a front widened driveway, a front covered porch with stairs, a rear basement walkout, a rear ground floor covered deck, rear second and third floor balconies, and a rear in-ground swimming pool. Also, to construct a one-storey ancillary building (to contain a washroom and mechanical pool room) in the rear yard, abutting the pool.

    240 m away · filed Apr 10, 2025 · Approved

  • 242 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, side (west) stairs, a rear third storey balcony, a rear ground floor covered patio with stairs, a rear basement walkout, and an in-ground swimming pool.

    140 m away · filed Jan 8, 2025 · Refused

  • 71 Hillholm Rd · Minor variance

    To alter the existing two-and-one-half storey detached dwelling by constructing a one-storey front portico addition, a rear one-storey addition, and a rear second storey addition.

    150 m away · filed Jan 2, 2025 · Approved

  • 62 Hillholm Rd · Minor variance

    To construct a new three-storey detached dwelling with a front horseshoe driveway, a covered front porch with stairs, a rear covered deck, and an inground swimming pool. Also, to construct a one-storey ancillary building (to contain a washroom and mechanical pool room) in the rear yard, abutting the pool.

    240 m away · filed Dec 27, 2024 · Refused

  • 221 Chaplin Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear second floor deck with stairs, and a rear basement (ground floor) walkout with a patio.

    240 m away · filed Aug 27, 2024 · Refused

  • 263 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage on the upper basement level (accessed by a car lift), an indoor pool on the lower basement level, rear basement walkouts on the upper and lower basement levels, and a rear ground floor deck.

    190 m away · filed Jul 24, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.