Toronto address · Ward 18, Willowdale
49 Bogert Ave
Lansing United Church
The City of Toronto has 10 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
To erect and display one non-illuminated ground sign, displaying static copy, containing two sign faces. Erecting at the southerly frontage of a church property. Measuring 1.52m at 1.52m at the height of 2.36m.***LANSING UNITED CHURCH***
Applied Oct 5, 2018 · issued Nov 2, 2018 · completed Dec 16, 2021 · Permit 18 236802 DST
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 3 electromagnetic locks, one on the basement level and two on the lower level.
Applied May 31, 2017 · issued Jun 26, 2017 · completed Nov 20, 2017 · Permit 17 170185 FSU
- Closed
Addition or alteration · Addition(s)
Revision - Revised foyer 203 posted occupancy, change from ladder access to Sanctuary ceiling to inspection hatches, addition of skylights, area confirmation of chancel
Applied May 25, 2017 · issued Jul 17, 2017 · completed Jun 6, 2018 · Permit 12 243988 BLD (revision 02)
- Closed
Addition or alteration · Addition(s)
Revision to plans - Change the original 1 hour fire rated separation floor assembly to 0 hour fire separation non-combustible construction at floor level elevation 182.26.Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied Oct 6, 2016 · issued Oct 24, 2016 · completed Jun 6, 2018 · Permit 12 243988 BLD (revision 01)
- Closed
Drains and site services
Drain - Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied Jun 2, 2015 · issued Jun 16, 2015 · completed Jun 18, 2018 · Permit 12 243988 DRN
- Closed
Heating and ventilation
HVAC - Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied May 25, 2015 · issued Jan 18, 2016 · completed Jun 11, 2018 · Permit 12 243988 HVA
- Closed
Plumbing
Plumbing - Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied May 25, 2015 · issued Jan 18, 2016 · completed Jun 11, 2018 · Permit 12 243988 PLB
- Closed
Drains and site services · Inside and outside drains
Drain - Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied May 25, 2015 · issued Jun 16, 2015 · completed Jun 18, 2018 · Permit 12 243988 STS
- Closed
Addition or alteration · Addition(s)
Two storey east addition plus one level of underground parking to the Lansing United Church, to be used for the purposes of a Social Facility, including a Child Care Centre.
Applied Sep 10, 2012 · issued Jan 20, 2016 · completed Jun 6, 2018 · Permit 12 243988 BLD
- Closed
Demolition
Lansing United Church - Partial demolition of church building
Applied Jul 22, 2011 · issued Sep 21, 2011 · completed Oct 24, 2025 · Permit 11 244023 DEM
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
51 storeys · 604 homes · Residential
110 m away · Site plan · Under review · filed Nov 12, 2025
- Under review
53-63 Sheppard Avenue West and 62-68 Bogert Avenue
390 homes · Residential
120 m away · Condominium · Under review · filed Nov 6, 2021
- Under review
- Under review
48 storeys · 479 homes · Mixed use
180 m away · Rezoning · Under review · filed Feb 6, 2026
- Under review
6 storeys · Not stated in the file
190 m away · Site plan · Under review · filed May 19, 2026
- Under review
Neighbours’ Committee of Adjustment files within 250 m
63 Johnston Ave · Minor variance
To constuct a three-storey fourplex with a front bay window.
180 m away · filed Jul 13, 2026 · Refused
63 Johnston Ave · Minor variance
To constuct a three-storey fourplex with a front bay window.
180 m away · filed Jul 13, 2026 · Refused
12 Florence Ave · Minor variance
To convert the existing two-storey detached dwelling into a place of worship.
240 m away · filed Jun 18, 2026 · Approved on condition
105 Poyntz Ave · Minor variance
To construct a new two storey detached dwelling. File B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.
230 m away · filed Apr 16, 2026 · Hearing scheduled
105 Poyntz Ave · Consent
To obtain consent to sever the property into two undersized residential lots. Files B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.
230 m away · filed Apr 16, 2026 · Hearing scheduled
105 Poyntz Ave · Minor variance
To construct a new two storey detached dwelling. File B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.
230 m away · filed Apr 16, 2026 · Hearing scheduled
53 Johnston Ave · Minor variance
To construct a new detached dwelling, with a front porch and rear deck.
170 m away · filed Dec 29, 2025 · Approved
62 Sheppard Ave W · Minor variance
To allow the existing use of a car rental agency to continue in perpetuity and legalize the existing landuse and driveway width.
170 m away · filed Oct 3, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.