Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

49 Endean Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - interior alterations, add skylight

    Applied Oct 1, 2020 · issued Nov 18, 2020 · completed Sep 29, 2021 · Permit 20 201250 HVA

    Closed
  • Small residential project · Multiple projects

    interior alterations, add skylight

    Applied Oct 1, 2020 · issued Nov 18, 2020 · completed Sep 29, 2021 · Permit 20 201250 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 77 Galt Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (above the rear two-storey portion of the dwelling) and underpinning the basement. Also, to install a ground-mounted air-conditioning device in the front yard.

    230 m away · filed Jun 12, 2026 · Approved

  • 9 Peyton Lane · Minor variance

    210 m away · filed Apr 28, 2025 · Application withdrawn

  • 9 Peyton Lane · Minor variance

    To construct a new three-storey detached building (fourplex - four residential dwelling units - refer to the basement floor plan whereby one dwelling unit is partially above another dwelling unit). Each residential dwelling unit will have an integral garage, and a rear partially covered second floor balcony. This proposal has been reviewed as a building abutting side lot lines as the lot does not abut a municipal street. Also, the existing two-storey detached building (currently abutting Peyton Lane) will be maintained and unaltered.

    210 m away · filed Apr 28, 2025 · Postponed

  • 11 Stanton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition with a rear balcony, and a rear ground floor deck.

    210 m away · filed Apr 28, 2025 · Approved

  • 9 Peyton Lane · Consent

    210 m away · filed Apr 28, 2025 · Application withdrawn

  • 1 Sawden Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition with a balcony.

    250 m away · filed Apr 26, 2025 · Approved

  • 25 Parkfield Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with rear ground floor stairs. The existing rear ground floor deck and stairs will be demolished.

    220 m away · filed Apr 23, 2025 · Approved

  • 1043 Gerrard St E · Minor variance

    To construct a rear two-storey detached house (abutting the laneway) with front and side (west) juliet balconies on the second floor. The existing two-storey (mixed-use) semi-detached building will be maintained and unaltered. There will be two residential dwelling units on this lot (one dwelling unit within the mixed-use building and one dwelling unit within the detached house).

    250 m away · filed Apr 2, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.