Toronto address · Ward 13, Toronto Centre
495 Jarvis St
Jarvis Collegiate Institute
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for restoration and waterproofing repairs to the existing underground parking garage.
Applied Jul 17, 2020 · issued Aug 18, 2020 · Permit 20 168968 BLD
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
Proposed backflow prevention device.
Applied Feb 9, 2018 · issued Mar 7, 2018 · Permit 18 115545 PSA
- Inspections under way
Plumbing · Other
1 backflow prevention device, and floor drains.SEE HVAC FILE FOR PLANS
Applied May 14, 2009 · issued Jun 8, 2009 · Permit 09 138363 PSA
- Closed (dormant)
Heating and ventilation · Boiler/Furnace: SFD/Semi/TH
Replacing 3 boilers and piping.
Applied May 14, 2009 · issued Jun 8, 2009 · completed Jun 8, 2026 · Permit 09 138352 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
110-114 Maitland Street and 440 Jarvis Street
56 storeys · 579 homes · Mixed use
150 m away · Site plan · Under review · filed Sep 22, 2025
- Approved
63 storeys · 590 homes · Residential
200 m away · Rezoning · Approved · filed May 2, 2023
- Under appeal
102-120 Earl Place and 561 Jarvis Street
58 storeys · 818 homes · Residential
230 m away · Site plan · Under appeal · filed Aug 4, 2022
- Under appeal
28 storeys · 258 homes · Mixed use
250 m away · Site plan · Under appeal · filed Jan 30, 2024
- Under review
2-8 Earl Street and 5 Huntley Street
63 storeys · Residential
260 m away · Site plan · Under review · filed Sep 23, 2024
- Under review
29 storeys · 213 homes · Residential
280 m away · Site plan · Under review · filed Aug 18, 2022
Neighbours’ Committee of Adjustment files within 250 m
72 Wellesley St E · Minor variance
To alter the existing mixed-use building by installing a take-out eating establishment (retail bakery) within an existing unit on the ground level.
230 m away · filed Nov 14, 2022 · Approved
159 Wellesley St E · Consent
To obtain consent for the creation of a new easement.
240 m away · filed Dec 7, 2020 · Approved with conditions
514 Jarvis St · Minor variance
To alter the existing 2½-storey detached dwelling with a rear one-storey historic carriage house by constructing a second storey addition above the carriage house and a one-storey garage with a rooftop deck that will connect the main dwelling and the carriage house.
220 m away · filed Dec 27, 2018 · Approved
512 Jarvis St · Minor variance
To renovate the existing heritage building to accomodate a non-profit rooming house consisting of 24 dwelling rooms.
210 m away · filed Apr 10, 2017 · Refused
159 Wellesley St E · Minor variance
To alter the redevelopment plan for a 36-storey mixed-used building, approved under Site-Specific By-law 826-2013 with respect to development standards associated with: gross floor area, building height, dwelling unit breakdown, rate of indoor amenity space, off-site parking, bicycle parking spaces, and building envelope.
240 m away · filed Feb 16, 2017 · Approved
81 Wellesley St E · Minor variance
To modify the development scheme for a 28-storey, mixed-use building approved under the Site Specific By-law approved by the OMB (PL140555), February 17, 2016, by reducing the required number of parking spaces.
200 m away · filed Jan 23, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.