The City of Toronto has 18 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    1 Ground Sign*****TORONTO AND REGION CONSERVATION AUTHORITY *****

    Applied Jun 2, 2026 · issued Jun 16, 2026 · completed Aug 31, 2026 · Permit 26 175719 DST

    Closed
  • Designated structure · Sign building permit related

    A proposal to erect and display 14 ground signs all non-illuminated and displaying ststic copy.**TORONTO CONSERVATION AUTHORITY**

    Applied Dec 6, 2024 · issued Jan 15, 2025 · completed Jan 16, 2026 · Permit 24 247478 DST

    Closed
  • Alternative solution

    Alternative Solution - It is proposed to locate one of the required 38 mm diameter fire hose cabinets within exit stair A enclosure. The remaining required cabinets will be located within the floor areas as required for hose coverage.

    Applied Aug 21, 2024 · completed Aug 30, 2024 · Permit 24 201734 ALT

    Approved
  • Heating and ventilation

    Revision 01 - Geothermal Field Change to Open Loop system, as noted in cover letter attachedHVAC - To construct a new four storey TRCA administrative office building

    Applied Jun 22, 2023 · issued May 9, 2024 · completed Jan 20, 2025 · Permit 19 118631 HVA (revision 01)

    Closed
  • Alternative solution

    To maintain the continuity of the 1 h fire separation the following fire stopping details are proposed for where the CLT floor panels meet:1.Where there is gap of up to 3/8 inch between CLT floor panels the gap is to be filled from the top side with fire stop sealant in accordance with drawing number NS09122007.2.Where there is gap of more than 3/8 inch and up to 3 inch between CLT floor panels the gap is to be filled with packing material and fire stop sealant in accordance with drawing number NS08022044.3.Where there is no gap between CLT floor panels and top side application is possible dr…

    Applied Jun 14, 2023 · completed Aug 30, 2023 · Permit 23 160884 ALT

    Approved
  • New building

    REVISION 01: fire separation,To construct a new four storey TRCA administrative office building

    Applied Dec 21, 2022 · issued Jan 2, 2024 · completed Feb 25, 2025 · Permit 19 118631 BLD (revision 01)

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - To construct a new four storey TRCA administrative office building

    Applied Dec 31, 2020 · issued Mar 11, 2021 · completed Aug 20, 2021 · Permit 19 118631 STR

    Closed
  • Conditional permit · Site service

    Conditional Permit - Site Services - To construct a new four storey TRCA administrative office building

    Applied Sep 30, 2020 · issued Nov 25, 2020 · completed Nov 22, 2021 · Permit 19 118631 STS

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - To construct a new four storey TRCA administrative office building

    Applied Sep 15, 2020 · completed Mar 22, 2021 · Permit 19 118631 FSU

    Closed
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - To construct a new four storey TRCA administrative office building

    Applied Feb 25, 2020 · issued Mar 30, 2020 · completed Aug 20, 2021 · Permit 19 118631 FND

    Closed
  • Alternative solution

    Alternative Solution - to assess the fire resistance ratings of combustible structural assemblies by an alternative solution. The fire resistance rating of CLT floor assemblies,Glulam beams and columns will be determined based on engineering calculations. Please refer to "VFT17146R03 TRCA Headquarters Structural Fire Resistance Alt Soln 06Dec2019" by Vortex Fire Consulting Inc. for the proposed alternative.

    Applied Dec 18, 2019 · completed Jun 11, 2020 · Permit 19 262645 ALT

    Approved
  • Alternative solution

    Alternative Solution for three small floor openings in the subject building which does not comply with the configuration requirement per OBC 3.2.8.3. to be open into the interconnected floor space in lieu of terminating at vertical fire separations as required by OBC 3.2.8.1. A comparative study is conducted using CFD and egress modeling to demonstrate that the proposed design performs as well as an OBC acceptable solution.

    Applied Dec 18, 2019 · completed Sep 24, 2020 · Permit 19 262641 ALT

    Approved
Show 6 more permits
  • Plumbing

    Plumbing - To construct a new four storey TRCA administrative office building

    Applied Feb 25, 2019 · issued Mar 11, 2021 · completed Jan 31, 2025 · Permit 19 118631 PLB

    Closed
  • Heating and ventilation

    HVAC - To construct a new four storey TRCA administrative office building

    Applied Feb 25, 2019 · issued Apr 27, 2021 · completed Jan 20, 2025 · Permit 19 118631 HVA

    Closed
  • Drains and site services

    Drain - To construct a new four storey TRCA administrative office building

    Applied Feb 25, 2019 · issued May 14, 2020 · completed Jan 31, 2025 · Permit 19 118631 DRN

    Closed
  • New building

    To construct a new four storey TRCA administrative office building

    Applied Feb 25, 2019 · issued Aug 23, 2021 · completed Feb 25, 2025 · Permit 19 118631 BLD

    Closed
  • Demolition

    Demolition of existing single storey slab on grade building to facilitate construction of future TRCA office building.

    Applied Aug 7, 2018 · issued Nov 20, 2018 · Permit 18 205175 DEM

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Install a 2" floor mount

    Applied Mar 8, 2017 · issued Apr 29, 2022 · completed Sep 3, 2026 · Permit 17 126347 PSA

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New NR building

    To construct a four-storey office building.

    Decision: Approved (hearing Mar 28, 2019)

    Filed Feb 5, 2019 · File A0065/19EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.