Toronto address · Ward 19, Beaches-East York
5 Vicross Rd
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REV 02: revision to circuit layout
Applied Mar 1, 2022 · issued Mar 23, 2022 · Permit 20 166636 HVA (revision 02)
- Revision issued
Heating and ventilation
REV01: changes to layout
Applied Aug 25, 2021 · issued Sep 7, 2021 · Permit 20 166636 HVA (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposed new basement apartment, interior alterations, new porch, rear deck, and new rear foundation with raise rear walls for new rear roof structure.
Applied May 3, 2021 · issued May 10, 2021 · Permit 20 166636 HVA
- Inspections under way
Small residential project · Multiple projects
Proposed new basement apartment, interior alterations, new porch, rear deck, and new rear foundation with raise rear walls for new rear roof structure.
Applied Jul 13, 2020 · issued Jul 27, 2020 · 1 home added · Permit 20 166636 BLD
- Inspections under way
Plumbing
Plumbing - construct basement apartment, interior alterations, new porch, deck, addition
Applied Jul 13, 2020 · issued Jul 27, 2020 · Permit 20 166636 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
8 Holmstead Ave · Consent
To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.
170 m away · filed Jun 19, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage a rear basement walkout, and a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
170 m away · filed Feb 14, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage, a rear basement walkout, a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
170 m away · filed Feb 14, 2025 · Approved
59 Squires Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition with a rear covered balcony, and a secondary suite within the basement. Also, to construct a carport along the south side of the dwelling.
120 m away · filed Feb 15, 2024 · Approved
68 Glencrest Blvd · Minor variance
To alter the existing one-storey ancillary building (detached garage, abutting Glencrest Boulevard and Squires Avenue) by constructing a second storey addition to contain a garden suite. There will be an exterior staircase along the north wall to access this garden suite.
180 m away · filed Oct 20, 2023 · Approved
24 Merritt Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage and an oversized driveway. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
210 m away · filed Mar 14, 2023 · Withdrawn
2949 St Clair Ave E · Minor variance
To construct a new three-storey detached dwelling with an integrated garage and a rear second storey balcony.
230 m away · filed Jan 4, 2023 · Approved
29 Furnival Rd · Minor variance
To construct a new one-and-one-half-storey ancillary building (garden suite), in the rear yard of the existing one-and-one-half-storey detached dwelling.
210 m away · filed Oct 26, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.