Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Revision to Plumbing - hot water tank relocated in mechanical room, sump pump addition, drainage layout revised, fire protection plan revised, sprinklers in food processing room changed from dry to wet sprinklers - Homes First Society

    Applied Apr 25, 2023 · issued Jun 9, 2023 · completed May 15, 2026 · Permit 21 148865 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02: sprinkler drawings, additional sprinklers to be added to the existing sprinkler system for processing room Revision 01 - Change to parking spaces convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied Mar 30, 2023 · issued Apr 3, 2023 · Permit 21 148865 BLD (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 01 - Change to parking spaces convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied Oct 6, 2021 · issued Oct 28, 2021 · Permit 21 148865 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Revision 01 HVAC - convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied Oct 6, 2021 · issued Dec 20, 2021 · Permit 21 148865 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied May 2, 2021 · issued May 19, 2021 · Permit 21 148865 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied May 2, 2021 · issued Jun 4, 2021 · Permit 21 148865 HVA

    Inspections under way
  • Plumbing

    Plumbing - convert 2 spaces from storage to kitchen to prepare food to supply the shelter "Homes First Society"

    Applied May 2, 2021 · issued Jun 1, 2021 · completed May 15, 2026 · Permit 21 148865 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal for an installation of a dcva backflow preventer

    Applied Apr 21, 2020 · issued Jun 12, 2020 · completed Mar 12, 2026 · Permit 20 136174 PSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Installation of 2" backflow preventor for premise isolation.

    Applied Dec 14, 2017 · completed Jan 3, 2018 · Permit 17 275530 PSA

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a 2" back flow preventor.

    Applied Jan 23, 2017 · completed Feb 27, 2017 · Permit 17 107853 PSA

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    Decision: Approved (hearing Sep 15, 2021)

    Filed Apr 24, 2021 · File A0630/21TEY

    Closed
  • Minor variance · Other

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    Decision: Approved (hearing Dec 4, 2020)

    Filed Jun 8, 2020 · File A0600/20TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 576 Sherbourne St · Minor variance

    190 m away · filed Apr 22, 2026 · Postponed

  • 10 Earl St · Consent

    To obtain consent to sever the lot into two stratified parcels for the purpose of conveying the air rights above the existing two-storey semi-detached dwelling, as per City Council¿s direction to secure the tower separation on the lands municipally known as 5 Huntley Street and 2-8 Earl Street and a Portion of 10 Earl Street.

    140 m away · filed Jan 19, 2026 · Approved

  • 591 Sherbourne St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.

    220 m away · filed Jun 30, 2025 · Approved

  • 601 Sherbourne St · Minor variance

    To facilitate the redevelopment of this site for a 51-storey mixed-use building, including the Parkland dedication requirement. This application is necessitated to modify Sections 4, 7, 16, and 24 under Appendix 1, Site Specific Zoning By-law 1528-2019, and Sections 4, 7, 15, and 23 under Schedule A, Site Specific Zoning By-law 1529-2019, which relates to the timing of conveyance and lease of the parklands and the construction for park improvements.

    250 m away · filed Apr 17, 2025 · Approved

  • 10 Huntley St · Consent

    To obtain consent to sever the property into two lots to differentiate the retained lands (existing 20-storey apartment) from the development lands (proposed 45-storey residential building), and to create reciprocal access easements/rights-of-way.

    200 m away · filed Mar 24, 2025 · Postponed

  • 545-565 Sherbourne St · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    60 m away · filed May 2, 2023 · Approved

  • 123 Isabella St · Minor variance

    To convert the existing three-storey hospice care facility containing 9 beds into a residential care facility for a transitional residence containing 20 rooms.

    170 m away · filed Mar 31, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.