Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

50 Gloucester St

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Cosmetic upgrade to unit # 311

    Applied Dec 6, 2019 · issued Jan 7, 2020 · completed Jun 25, 2020 · Permit 19 257979 BLD

    Closed
  • Heating and ventilation

    HVAC - Cosmetic upgrade to unit # 311

    Applied Dec 6, 2019 · issued Jan 9, 2020 · completed Jun 18, 2020 · Permit 19 257979 HVA

    Closed
  • Plumbing

    Plumbing - Cosmetic upgrade to unit # 311

    Applied Dec 6, 2019 · issued Jan 9, 2020 · completed Mar 20, 2020 · Permit 19 257979 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to suites 104 and 211 in the existing rental Apartment Building, scope of work includes Electrical, Plumbing and HVAC.

    Applied Aug 21, 2018 · issued Nov 1, 2018 · completed Oct 18, 2019 · Permit 18 212840 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to suites 104 and 211 in the existing rental Apartment Building, scope of work includes Electrical, Plumbing and HVAC.

    Applied Aug 21, 2018 · issued Nov 1, 2018 · completed Oct 25, 2019 · Permit 18 212840 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to suites 104 and 211 in the existing rental Apartment Building, scope of work includes Electrical, Plumbing and HVAC.

    Applied Aug 21, 2018 · issued Nov 1, 2018 · completed Oct 21, 2019 · Permit 18 212840 PLB

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for facade repairs including brick and stone masonry repairs, and sealant repairs; and basement level roof slab repairs including localized concrete topping replacement and waterproofing membrane installation.

    Applied Feb 28, 2017 · issued Mar 28, 2017 · completed Sep 27, 2017 · Permit 17 122171 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 55 Isabella Street

    75 storeys · 843 homes · Mixed use

    50 m away · Rezoning · Under review · filed Mar 17, 2026

    Under review
  • 48 Isabella Street

    69 storeys · 814 homes · Residential

    120 m away · Rezoning · Under review · filed Jun 23, 2025

    Under review
  • 572 Church Street

    12 storeys · 115 homes · Mixed use

    170 m away · Condominium · Under review · filed Nov 7, 2021

    Under review
  • 81 Isabella Street

    69 storeys · 647 homes · Residential

    180 m away · Rezoning · Under appeal · filed Jun 10, 2025

    Under appeal
  • 552-570 Church Street and 64-66 Wellesley Street East

    36 storeys · 409 homes · Mixed use

    190 m away · Rezoning · Approved · filed Feb 20, 2026

    Approved
  • 88 Isabella Street

    50 storeys · 508 homes · Residential

    200 m away · Site plan · Approved · filed Apr 26, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 680 Yonge St · Minor variance

    To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.

    230 m away · filed Aug 23, 2024 · Approved

  • 577 Yonge St · Minor variance

    To permit the following uses within the existing four-storey non-residential building: a nightclub use within the basement, eating establishment use on the ground level, retail store use on the second level, place of assembly use on the third level, and recreation use on the fourth level.

    210 m away · filed Aug 23, 2024 · Approved

  • 593 Yonge St · Minor variance

    To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.

    190 m away · filed Jul 23, 2024 · Approved

  • 7 Gloucester St · Consent

    To obtain consent to sever the property into two residential lots. The existing easements/rights-of-way will be maintained and unaltered. The existing 44-storey mixed-use building (also on the lot) will be maintained and unaltered. This building is under a condo ownership and requires a variance to the Zoning By-law as outlined in Minor Variance Application A0653/24TEY.

    150 m away · filed Jul 23, 2024 · Approved

  • 11 Gloucester St · Minor variance

    To convert the existing two-and-one-half-storey townhouse into a mixed-use building.

    140 m away · filed Jul 23, 2024 · Approved

  • 62 Charles St E · Minor variance

    To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.

    240 m away · filed Jan 12, 2024 · Approved

  • 66 Charles St E · Minor variance

    To convert the existing two-and-one-half-storey detached residential (heritage) building into an apartment building by maintaining only the front portion of the existing building and constructing a 9-storey rear addition (and one mechanical penthouse level). Also, to construct a front ground floor porch and stairs, a front basement walkout, rear balconies on the second to fourth storeys, a front deck on the fourth storey, as well as front and rear balconies on the fifth to nineth storeys. There will be a total of 16 dwelling units within this apartment building.

    250 m away · filed Sep 6, 2023 · Approved

  • 55 Charles St E · Consent

    To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.

    180 m away · filed Aug 31, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.