Toronto address · Ward 12, Toronto-St. Paul's
50 Merton St
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Proposal to construct interior partitions to create a new sever room in the basement of existing office building (27.7m2).
Applied May 21, 2013 · issued May 31, 2013 · completed Aug 11, 2021 · Permit 13 171563 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct interior partitions to create a new sever room in the basement of existing office building (27.7m2).
Applied May 21, 2013 · issued Jun 20, 2013 · completed Aug 9, 2021 · Permit 13 171563 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal for the installtion of a 1 1/2" backflow prevention device on the water system to be installed in the basement.
Applied May 5, 2009 · issued Jun 3, 2009 · completed Sep 7, 2021 · Permit 09 133737 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
46 storeys · 581 homes · Mixed use
20 m away · Rezoning · Under appeal · filed Aug 31, 2022
- Under review
40 storeys · 505 homes · Mixed use
20 m away · Condominium · Under review · filed Nov 3, 2021
- Under review
40 storeys · 477 homes · Residential
70 m away · Site plan · Under review · filed Nov 8, 2021
- Under review
40 storeys · 414 homes · Mixed use
150 m away · Site plan · Under review · filed Apr 19, 2022
- Under review
60 Balliol Street and 33 Davisville Avenue
33 storeys · 526 homes · Residential
180 m away · Site plan · Under review · filed Jun 14, 2022
- Approved
37 storeys · 442 homes · Mixed use
220 m away · Site plan · Approved · filed Oct 14, 2021
Neighbours’ Committee of Adjustment files within 250 m
30 Merton St · Consent
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
40 m away · filed Jul 23, 2026 · Hearing scheduled
119 Merton St · Minor variance
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
190 m away · filed Sep 17, 2025 · Approved
33 Davisville Ave · Consent
To obtain consent to sever the property into two lots, to maintain existing easements/rights-of-way as well as to create new easements/rights-of-way.
180 m away · filed May 2, 2024 · Approved
155 Balliol St · Minor variance
To permit the reduction of residential parking spaces provided within the 38-storey residential building, currently under review by Site Plan Application (File Number 21 225918 STE 12 SA). There will be a total of 442 residential dwelling units within this building.
240 m away · filed Mar 22, 2023 · Approved
119 Merton St · Minor variance
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
190 m away · filed Feb 15, 2023 · Approved
155 Balliol St · Consent
To obtain consent to sever the lot into two lots and to create new easements/rights-of-way for parking and vehicle access, as well as a dog walk area.
240 m away · filed Mar 9, 2022 · Approved
1913 Yonge St · Minor variance
To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.
250 m away · filed Feb 24, 2022 · Approved
45 Balliol St · Consent
To obtain consent for a strata severance and to create easements/rights-of-way.
60 m away · filed May 9, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.