Toronto address · Ward 9, Davenport
50 Shanly St
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01: change to the hvac design.
Applied Nov 2, 2020 · issued Dec 1, 2020 · completed Aug 6, 2021 · Permit 19 129530 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Design the existing basement as a third unit and create window egress at the rear of the building
Applied Mar 22, 2019 · issued Jun 17, 2019 · completed Aug 6, 2021 · Permit 19 129530 HVA
- Closed
Plumbing
Plumbing - Design the existing basement as a third unit and create window egress at the rear of the building
Applied Mar 22, 2019 · issued Jun 17, 2019 · completed Aug 6, 2021 · Permit 19 129530 PLB
- Closed
Small residential project · Interior alterations
Add basement 3rd unit to detached 2-unit dwelling; create window egress at the rear of the building
Applied Mar 22, 2019 · issued Jun 17, 2019 · completed Oct 20, 2021 · 1 home added · Permit 19 129530 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
800 Dovercourt Rd · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
180 m away · filed Jul 13, 2026 · Hearing scheduled
91 Salem Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new front one-storey addition with stairs, a front basement walkout, and a rear one-storey addition with a wood landing. The existing rear ground floor deck will be maintained and unaltered.
150 m away · filed Oct 23, 2025 · Approved
79 Bartlett Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear walkway. Also, to alter the existing one-storey ancillary building (rear detached garage, abutting the laneway) by constructing a complete second storey addition for one laneway suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).
250 m away · filed Oct 24, 2024 · Approved
301 Delaware Ave · Minor variance
To permit the existing rear third storey addition, which was constructed without an authorized building permit.
190 m away · filed May 2, 2024 · Approved
99 Bartlett Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front stairs, and enclosing the front porch.
240 m away · filed Feb 13, 2024 · Approved
386 Concord Ave · Minor variance
To construct a new two-storey laneway suite.
240 m away · filed Jan 26, 2024 · Approved
297 Delaware Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling (currently under construction) by converting it into a duplex dwelling (for two residential dwelling units). Also, to construct a rear third storey addition (to convert a portion of the rear third storey terrace into habitable space) and a front basement walkout entrance for the dwelling unit within the basement.
190 m away · filed Jul 28, 2023 · Refused
27 Southview Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by a complete third storey addition, and a rear one-storey with a roof deck above. Also, to reconstruct the front porch and stairs.
220 m away · filed Jul 21, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.