Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

50 Stilecroft Dr

Stilecroft Public School

The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Proposal for back-flow preventer in existing incoming water main

    Applied Sep 10, 2026 · Permit 26 235565 PSA

    Not started
  • Addition or alteration · Multiple projects

    Proposal to replace the existing light autoclaved aerated concrete (aac) siporex deck at roof D with new steel deck. The existing roof assembly at roof D, roof B, roofs A and A1 shall also be replaced.

    Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100905 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal to replace the existing light autoclaved aerated concrete (aac) siporex deck at roof D with new steel deck. The existing roof assembly at roof D, roof B, roofs A and A1 shall also be replaced.

    Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100905 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to replace the existing light autoclaved aerated concrete (aac) siporex deck at roof D with new steel deck. The existing roof assembly at roof D, roof B, roofs A and A1 shall also be replaced.

    Applied Jan 5, 2026 · issued Feb 2, 2026 · Permit 26 100905 HVA

    Permit issued
  • Designated structure · Solar collector

    Installation of a rooftop photovoltaic array on an existing building - Stilecroft Public School

    Applied Jun 27, 2016 · issued Jul 26, 2016 · completed Jan 23, 2017 · Permit 16 180907 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.