Toronto address · Ward 23, Scarborough North
50 Verne Cres
The City of Toronto has 32 building permits since 2017 (12 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revocation pending
Heating and ventilation · Alter: add on /Ductwork
install gas forced air hvac system from baseboard
Applied Nov 17, 2022 · issued Dec 2, 2022 · Permit 22 230492 MSA
- Inspections under way
Plumbing
Plumbing - Proposal to legalize the asbuilt finished basment.
Applied Mar 22, 2022 · issued Apr 1, 2022 · Permit 22 118369 PLB
- Closed
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Mar 7, 2022 · issued May 20, 2022 · completed Sep 9, 2022 · Permit 22 120121 MSA
- Inspections under way
Small residential project · Interior alterations
Proposal to legalize the asbuilt finished basment.
Applied Mar 1, 2022 · issued Apr 1, 2022 · Permit 22 118369 BLD
- Cancelled
Heating and ventilation · Alter: add on /Ductwork
Proposed Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Feb 25, 2022 · completed Aug 30, 2022 · Permit 22 117292 MSA
- Revocation pending
Heating and ventilation · Alter: add on /Ductwork
Proposed to switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection.
Applied Jan 21, 2022 · issued Jan 24, 2022 · Permit 22 106268 MSA
- Revocation pending
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Proposal tp switch the hvac system from electrical baseboard to natural gas force air convectional system.
Applied Dec 24, 2021 · issued Jan 10, 2022 · Permit 21 251331 MSA
- Cancelled
Heating and ventilation · Other
Convert the hvac system from electrical baseboard to natural gass forced air convectional system. Ducting design and equipment selection.
Applied Dec 21, 2021 · completed Jan 17, 2022 · Permit 21 250469 MSA
- Closed
Heating and ventilation · Boiler/Furnace: SFD/Semi/TH
Proposal to replace the electrical baseboard heating system with a natural gas forced air convectional system in an existing townhouse that is part of a condo complex - UNIT 46
Applied Dec 15, 2021 · issued Jan 10, 2022 · completed Aug 2, 2022 · Permit 21 248914 MSA
- Revocation pending
Heating and ventilation · HVAC: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system Unit 49
Applied Dec 3, 2021 · issued Dec 7, 2021 · Permit 21 244851 MSA
- Closed
Heating and ventilation · HVAC: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Jun 18, 2021 · issued Jun 23, 2021 · completed Jan 18, 2022 · Permit 21 172964 MSA
- Closed
Heating and ventilation · Boiler/Furnace: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection.
Applied Jun 17, 2021 · issued Jun 17, 2021 · completed Aug 26, 2022 · Permit 21 171843 MSA
Show 20 more permits
- Revocation pending
Heating and ventilation · HVAC: SFD/Semi/TH
To switch the HVAC system from electrical baseboard to natural gas force air convectional system
Applied Jun 16, 2021 · issued Jun 29, 2021 · Permit 21 171769 MSA
- Closed
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the existing HVAC system from electric baseboard to natural gas forced air convectional system. Ducting design and equipment selection.
Applied Jun 16, 2021 · issued Jun 18, 2021 · completed Feb 8, 2022 · Permit 21 171633 MSA
- Inspections under way
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied May 26, 2021 · issued Jun 2, 2021 · Permit 21 161024 MSA
- Revocation pending
Heating and ventilation · Boiler/Furnace: SFD/Semi/TH
Proposal to replace the electrical baseboards to natural gas force air convectional system in an existing SFD-townhouse as part of a larger complex.
Applied May 22, 2021 · issued May 28, 2021 · Permit 21 159332 MSA
- Inspections under way
Heating and ventilation · Alter: add on /Ductwork
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied May 10, 2021 · issued Jun 2, 2021 · Permit 21 152351 MSA
- Inspections under way
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the HVAC system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection.
Applied May 9, 2021 · issued May 12, 2021 · Permit 21 152229 MSA
- Inspections under way
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the hvac system from elctrical baseboards to natural gas forced air convectional system.
Applied May 9, 2021 · issued May 10, 2021 · Permit 21 152311 MSA
- Revocation pending
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied May 4, 2021 · issued May 7, 2021 · Permit 21 149789 MSA
- Permit issued
Heating and ventilation · Other
Switching the hvac system from electrical baseboard tonatural gas force air convectional system. Ducting design and equipment selection.
Applied Apr 27, 2021 · issued May 11, 2021 · Permit 21 146659 MSA
- Inspections under way
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Apr 13, 2021 · issued Apr 14, 2021 · Permit 21 139992 MSA
- Inspections under way
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the HVAC system from electrical baseboard to natural gas force air convection system. Ducting design and equipment selection.
Applied Apr 13, 2021 · issued Apr 15, 2021 · Permit 21 140236 MSA
- Revocation pending
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the HVAC system from electric baseboard to natural gas forced air convectional system.
Applied Apr 10, 2021 · issued Apr 12, 2021 · Permit 21 138574 MSA
- Closed
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Apr 9, 2021 · issued Apr 13, 2021 · completed Apr 13, 2022 · Permit 21 138312 MSA
- Inspections under way
Heating and ventilation · HVAC: SFD/Semi/TH
Proposal to switch the HVAC system from electrical baseboard to natural gas force air convection system
Applied Mar 31, 2021 · issued Apr 7, 2021 · Permit 21 134540 MSA
- Closed
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection
Applied Feb 27, 2021 · issued Mar 3, 2021 · completed Sep 7, 2021 · Permit 21 120986 MSA
- Closed
Heating and ventilation
HVAC - Proposed to switch HVAC system from electrical baseboard to natural gas force air system.
Applied Jan 27, 2021 · issued Feb 1, 2021 · completed Aug 9, 2022 · Permit 20 164186 HVA
- Closed
Small residential project · Interior alterations
Revision 01- Changes to plans .PROPOSED: Removal of an existing load-bearing wall.
Applied Oct 20, 2020 · issued Nov 23, 2020 · completed Sep 5, 2024 · Permit 20 164186 BLD (revision 01)
- Closed
Small residential project · Interior alterations
PROPOSED: Removal of an existing load-bearing wall.
Applied Jul 7, 2020 · issued Aug 13, 2020 · completed Sep 5, 2024 · Permit 20 164186 BLD
- Permit issued
Small residential project · Interior alterations
Proposed interior alterations to Basement for a new washroom, enclose furnace room and utility room, and interior alterations on ground floor and second floor of existing single family dwelling.
Applied Mar 9, 2018 · issued Mar 20, 2018 · Permit 18 127548 BLD
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to Basement for a new washroom, enclose furnace room and utility room, and interior alterations on ground floor and second floor of existing single family dwelling.
Applied Mar 9, 2018 · issued Mar 20, 2018 · Permit 18 127548 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
3 Lenthall Ave · Consent
To obtain consent for a technical severance of the property to re-establish six lots which merged on title. This Consent is delegated to the Deputy Secretary-Treasurer, there is no public hearing.
150 m away · filed Feb 21, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.