Toronto address · Ward 5, York South-Weston
50 Yarrow Rd
The City of Toronto has 8 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposed garden suite
Applied Apr 7, 2025 · issued Jul 9, 2025 · Permit 25 140919 HVA
- Permit issued
Drains and site services
Drain - Proposed garden suite
Applied Apr 7, 2025 · issued Jul 9, 2025 · Permit 25 140919 DRN
- Permit issued
Small residential project · New laneway / rear yard suite
Proposed garden suite
Applied Apr 7, 2025 · issued Jul 9, 2025 · 1 home added · Permit 25 140919 BLD
- Permit issued
Plumbing
Plumbing - Proposed garden suite
Applied Apr 7, 2025 · issued Jul 9, 2025 · Permit 25 140919 PLB
- Revision issued
Small residential project · Multiple projects
Rev 01: relocate laundry and remove one proposed partition.Proposal for a two storey rear addition including basement to an existing single family dwelling. Scope includes interior alterations, a front basement walkout and a rear basement walkout.
Applied Apr 30, 2024 · issued May 17, 2024 · Permit 21 119581 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Proposal for a two storey rear addition including basement to an existing single family dwelling. Scope includes interior alterations, a front basement walkout and a rear basement walkout.
Applied Feb 24, 2021 · issued Jun 14, 2021 · Permit 21 119581 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for a two storey rear addition including basement to an existing single family dwelling. Scope includes interior alterations, a front basement walkout and a rear basement walkout.
Applied Feb 24, 2021 · issued Jun 16, 2021 · Permit 21 119581 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for a two storey rear addition including basement to an existing single family dwelling. Scope includes interior alterations, a front basement walkout and a rear basement walkout.
Applied Feb 24, 2021 · issued Jun 14, 2021 · Permit 21 119581 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
2636-2654 Eglinton Avenue West and 1856 Keele Street
33 storeys · 370 homes · Mixed use
260 m away · Site plan · Under appeal · filed Dec 22, 2022
- Under review
24 storeys · 272 homes · Mixed use
320 m away · Site plan · Under review · filed Nov 24, 2021
Neighbours’ Committee of Adjustment files within 250 m
59 Yarrow Rd · Minor variance
To legalize and to maintain the existing detached garage and to construct a new one storey addition along the front of the detached garage in order to accommodate a new garden suite.
80 m away · filed Jul 2, 2026 · Deferred
1785 Keele St · Minor variance
To construct a new apartment building containing a total of six dwelling units.
180 m away · filed Jun 24, 2026 · Approved
9 Hertford Ave · Consent
To obtain consent to sever the lot into two undersized residential lots, to construct a pair of semi-detached fourplexes with garden suites in the rear yards and to create an easement/right-of-way for the purpose of pedestrian access.
140 m away · filed Feb 6, 2026 · Refused
9 Hertford Ave · Minor variance
To construct a new semi-detached fourplex with a garden suite in the rear yard.
140 m away · filed Feb 6, 2026 · Refused
9 Hertford Ave · Minor variance
To construct a new semi-detached fourplex with a garden suite in the rear yard.
140 m away · filed Feb 6, 2026 · Refused
1971 Keele St · Minor variance
180 m away · filed Jul 5, 2024 · Application withdrawn
63 Yarrow Rd · Minor variance
To construct a new triplex dwelling.
90 m away · filed Nov 16, 2023 · Approved
214 Bicknell Ave · Minor variance
To construct a two-storey rear addition.
100 m away · filed Jan 12, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.