Toronto address · Ward 7, Humber River-Black Creek
50 York Gate Blvd
The City of Toronto has 40 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Fire and security upgrade · Electromagnetic locks
Installing Intrusion and Access Control (IAC) Devices for Door S50.1
Applied Mar 13, 2025 · issued Apr 23, 2025 · completed Dec 19, 2025 · Permit 25 128807 FSU
- Closed
New building
REV 01: Removal of racks from affected drawing sheet A6152 and E6111
Applied Jan 15, 2025 · issued Feb 13, 2025 · completed May 5, 2025 · Permit 24 103589 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Construct Traction Power Substation - TPSS # 9 - Finch West LRT
Applied Nov 19, 2024 · issued Nov 28, 2024 · completed Apr 17, 2025 · Permit 21 121815 HVA
- Cancelled
Alternative solution
Alternative Solution application for the MOW storage Building for review and processing.
Applied Oct 29, 2024 · completed Jan 21, 2025 · Permit 24 232429 ALT
- Closed
New building
To construct a one storey vehicle tractor storage building
Applied Jan 11, 2024 · issued Jan 24, 2024 · completed May 5, 2025 · Permit 24 103603 BLD
- Closed
New building
Pre-fabricated single storey steel storage building
Applied Jan 11, 2024 · issued Feb 28, 2024 · completed May 5, 2025 · Permit 24 103589 BLD
- Closed
Plumbing
Plumbing - MSF handoff platform consists a combination of an enclosed space for the dispatch office andthe handover platforms which are partially protected with structural steel canopies
Applied Dec 7, 2023 · issued Jul 25, 2024 · completed May 16, 2025 · Permit 23 233441 PLB
- Closed
Drains and site services
Drain - MSF handoff platform consists a combination of an enclosed space for the dispatch office andthe handover platforms which are partially protected with structural steel canopies
Applied Dec 7, 2023 · issued Jul 25, 2024 · completed May 16, 2025 · Permit 23 233441 DRN
- Closed
New building
MSF handoff platform consists a combination of an enclosed space for the dispatch office andthe handover platforms which are partially protected with structural steel canopies
Applied Dec 7, 2023 · issued Jul 25, 2024 · completed May 6, 2025 · Permit 23 233441 BLD
- Closed
Heating and ventilation
HVAC - MSF handoff platform consists a combination of an enclosed space for the dispatch office andthe handover platforms which are partially protected with structural steel canopies
Applied Dec 7, 2023 · issued Jul 25, 2024 · completed May 20, 2025 · Permit 23 233441 HVA
- Closed
Plumbing
Revision 02 - Use of trap guard for the FD - due to damage primer pipe on siteRevision 01 - Hose bib separate water line added for means of meteringWater heater update to suit Maintanence requirements (Instantaneous to Tank Type)Emergency Overflow Drain addition, hose bib location updates, updates in equipment schedules from Shop drawing coordination, providing expansion joints for piping penetrations to MCER roomPlumbing - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Mar 18, 2022 · issued Mar 23, 2022 · completed Nov 30, 2023 · Permit 19 199071 PLB (revision 02)
- Closed
Heating and ventilation
Revision 01 - N+1 Redundancy Cooling for communication/emergency rooms, refrigeration piping reconfiguration, Motorized Dampers for exhaust fan, BAS connection addition to unit heaters (Gas, Infrared). Dog houses for refrigeration piping, update in equipment capacities with shop drawing/ sub-contractor coordination. Piping/Ductwork adjustments due to clash detection coordination. HVAC - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Jul 15, 2021 · issued Nov 18, 2021 · completed Nov 30, 2023 · Permit 19 199071 HVA (revision 01)
Show 28 more permits
- Closed
Plumbing
Revision 01 - Hose bib separate water line added for means of meteringWater heater update to suit Maintanence requirements (Instantaneous to Tank Type)Emergency Overflow Drain addition, hose bib location updates, updates in equipment schedules from Shop drawing coordination, providing expansion joints for piping penetrations to MCER roomPlumbing - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Jul 15, 2021 · issued Nov 18, 2021 · completed Nov 30, 2023 · Permit 19 199071 PLB (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Installation of one (1) maglock
Applied Jul 13, 2021 · issued Jul 23, 2021 · completed Nov 13, 2023 · Permit 21 183737 FSU
- Closed
New building
Construct Traction Power Substation - TPSS # 9 - Finch West LRT
Applied Mar 2, 2021 · issued Sep 9, 2021 · completed Aug 14, 2025 · Permit 21 121815 BLD
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Nov 10, 2020 · issued Aug 4, 2022 · completed Aug 5, 2022 · Permit 19 199071 FSU
- Closed
Designated structure · Retaining wall
Construction of sound barrier/retaining wall system for Finch West LRT
Applied Aug 17, 2020 · issued Oct 5, 2020 · completed Apr 3, 2024 · Permit 20 181268 DST
- Closed
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Mar 4, 2020 · issued Mar 10, 2020 · completed Dec 15, 2020 · Permit 19 199071 STR
- Closed
Temporary structure · Temporary structures
Construct a temporary shelter for the winter season to help keep the concrete warm - Finch West LRT.
Applied Jan 28, 2020 · issued Feb 12, 2020 · completed Aug 15, 2024 · Permit 20 109609 TPS
- Closed
Drains and site services · Inside and outside drains
Drain - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Dec 6, 2019 · issued Feb 4, 2020 · completed Nov 25, 2024 · Permit 19 199071 STS
- Approved
Alternative solution
Alternative solution for safety exits for the MSF building for the FWLRT
Applied Nov 14, 2019 · completed Mar 11, 2020 · Permit 19 249160 ALT
- Closed
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Sep 18, 2019 · issued Oct 21, 2019 · completed Dec 15, 2020 · Permit 19 199071 FND
- Closed
Drains and site services · Site service
Revision 01 - changes to the connectionConstruct temporary site services for four (4) trailers re: Finch West LRT (2 office trailers and 2 washroom trailers)
Applied Aug 19, 2019 · issued Aug 20, 2019 · completed Aug 20, 2024 · Permit 19 154199 STS (revision 01)
- Closed
New building
Construction of the maintenance and storage facility of the Finch West LRT.
Applied Aug 1, 2019 · issued Nov 18, 2021 · completed Dec 1, 2023 · Permit 19 199071 BLD
- Closed
Plumbing
Plumbing - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Aug 1, 2019 · issued Mar 10, 2020 · completed Nov 30, 2023 · Permit 19 199071 PLB
- Closed
Drains and site services
Drain - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Aug 1, 2019 · issued Oct 21, 2019 · completed Nov 25, 2024 · Permit 19 199071 DRN
- Closed
Heating and ventilation
HVAC - Construction of the maintenance and storage facility of the Finch West LRT.
Applied Aug 1, 2019 · issued Mar 10, 2020 · completed Nov 30, 2023 · Permit 19 199071 HVA
- Closed
Plumbing
Plumbing - Construct temporary washroom trailer (40m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Aug 20, 2024 · Permit 19 155435 PLB
- Closed
Heating and ventilation
HVAC - Construct temporary trailer (471.69m2) for Mosaic Office for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Nov 18, 2024 · Permit 19 155051 HVA
- Closed
Heating and ventilation
HVAC - Construct temporary washroom trailer (35m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Nov 18, 2024 · Permit 19 155055 HVA
- Closed
Heating and ventilation
HVAC - Construct temporary washroom trailer (40m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Nov 18, 2024 · Permit 19 155435 HVA
- Closed
Plumbing
Plumbing - Construct temporary trailer (471.69m2) for Mosaic Office for the FWLRT
Applied May 16, 2019 · issued Aug 20, 2019 · completed Aug 20, 2024 · Permit 19 155051 PLB
- Closed
Plumbing
Plumbing - Construct temporary washroom trailer (35m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Aug 20, 2024 · Permit 19 155055 PLB
- Closed
Temporary structure · Trailers
Construct temporary washroom trailer (40m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Aug 13, 2024 · Permit 19 155435 TPS
- Closed
Temporary structure · Trailers
Construct temporary trailer (471.69m2) for Mosaic Office for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Aug 13, 2024 · Permit 19 155051 TPS
- Closed
Temporary structure · Trailers
Construct temporary washroom trailer (35m2) for the FWLRT
Applied May 16, 2019 · issued Jul 24, 2019 · completed Aug 13, 2024 · Permit 19 155055 TPS
- Closed
Temporary structure · Trailers
Construct temporary trailer (394.65m2) for Contracting Authority Office for the FWLRT
Applied May 15, 2019 · issued Jul 24, 2019 · completed Aug 13, 2024 · Permit 19 154792 TPS
- Closed
Plumbing
Plumbing - Construct temporary trailer (394.65m2) for Contracting Authority Office for the FWLRT
Applied May 15, 2019 · issued Aug 20, 2019 · completed Aug 20, 2024 · Permit 19 154792 PLB
- Closed
Heating and ventilation
HVAC - Construct temporary trailer (394.65m2) for Contracting Authority Office for the FWLRT
Applied May 15, 2019 · issued Jul 24, 2019 · completed Nov 18, 2024 · Permit 19 154792 HVA
- Closed
Drains and site services · Site service
Construct temporary site services for four (4) trailers re: Finch West LRT (2 office trailers and 2 washroom trailers)
Applied May 14, 2019 · issued Jun 18, 2019 · completed Aug 20, 2024 · Permit 19 154199 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
27 storeys · 305 homes · Residential
270 m away · Site plan · Approved · filed Mar 21, 2022
- Under review
27 storeys · 2,730 homes · Residential
460 m away · Site plan · Under review · filed Aug 4, 2023
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.