The City of Toronto has 95 building permits since 2017 (42 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    Proposal for the standpipe installation to meet the requirements of the 2024 OBC as opposed to the 2012 OBC that this project is permitted under. Specifically, it is proposed that a Class 1 standpipe system, with risers and 65 mm hose connections (not in cabinets) be provided on the main landing of each floor within both exit stairwells of the renovated building and in the horizontal exits between the two buildings as required by 2013 NFPA 14.For further detail see report attached, "251029 CodeNext Alternative Solution Report 25P0241", dated Oct 29th.

    Applied Nov 7, 2025 · completed Nov 14, 2025 · Permit 25 250973 ALT

    Approved
  • Heating and ventilation

    HVAC - Proposal for TWAS roof upgrades

    Applied Aug 8, 2025 · completed Oct 1, 2025 · Permit 25 207216 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal for TWAS roof upgrades

    Applied Aug 8, 2025 · issued Sep 18, 2025 · Permit 25 207216 PLB

    Inspections under way
  • Addition or alteration · Other

    Proposal for TWAS roof upgrades

    Applied Aug 8, 2025 · issued Sep 16, 2025 · Permit 25 207216 BLD

    Inspections under way
  • Demolition

    Proposal to demolish of entire building (Plant Store)

    Applied Jul 18, 2025 · issued Sep 2, 2025 · Permit 25 196003 DEM

    Inspections under way
  • Demolition

    Proposal to demolish the 1 storey decommissioned Chlorination Building at a water treatment facility.

    Applied Mar 26, 2025 · issued Apr 10, 2025 · Permit 25 135132 DEM

    Inspections under way
  • Plumbing

    Plumbing - Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing and electrical upgrades.

    Applied Dec 30, 2024 · issued Mar 26, 2025 · Permit 24 254567 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing and electrical upgrades.

    Applied Dec 30, 2024 · issued Mar 26, 2025 · Permit 24 254567 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for Renovation & Upgrades to existing TWAS and Sludge Storage Tanks. Upgrades to existing biofilters including new heated enclosures for humidifier equipment. New structures will be built for the heating to accommodate the humidifier equipment; works includes mechanical, plumbing and electrical upgrades.

    Applied Dec 30, 2024 · issued Mar 26, 2025 · Permit 24 254567 HVA

    Permit issued
  • Plumbing

    Revision 01: See cover letter for detailed revisionsPlumbing - construct 4 access houses for water treatment plant, interior alteratio toexisting tunnels, concrete repair thorughout existing South plant tunnels, plumbing for 6 new site trailers

    Applied Apr 22, 2024 · issued May 6, 2024 · completed Mar 26, 2025 · Permit 18 165414 PLB (revision 01)

    Closed
  • Plumbing

    Revision 02 - Changes to existing plumbing systems within disinfection building and south effluent pumping station.Revision - related to washer dryer and hose bibs.Plumbing - Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with removal of various building components, electrical upgrades and minor grading and landscape works.

    Applied Apr 12, 2024 · issued May 6, 2024 · completed Mar 31, 2025 · Permit 20 200717 PLB (revision 02)

    Closed
  • Plumbing

    REVISION 01: Plumbing - Proposal to construct four (4) new hydraulic unit buildings and renovation of below grade Tunnel No. 12.

    Applied Oct 16, 2023 · issued Oct 18, 2023 · completed Feb 5, 2025 · Permit 18 271087 PLB (revision 01)

    Closed
Show 83 more permits
  • Plumbing

    Revision - related to washer dryer and hose bibs.Plumbing - Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with removal of various building components, electrical upgrades and minor grading and landscape works.

    Applied Jul 10, 2023 · issued Jul 24, 2023 · completed Mar 31, 2025 · Permit 20 200717 PLB (revision 01)

    Closed
  • Demolition

    Proposal to demolish a chlorine contact tank, anerobic filters and Old Headhouse structure - "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued May 3, 2024 · Permit 23 128834 DEM

    Permit issued
  • Drains and site services

    Drain - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the existing Northwest and Southwest treatment plants - Contract 2, "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued Sep 3, 2026 · Permit 23 128815 DRN

    Permit issued
  • Drains and site services · Inside and outside drains

    Drain - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the existing Northwest and Southwest treatment plants - Contract 2, "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued Sep 3, 2026 · Permit 23 128815 STS

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct new industrial building for open to air tanks, underground service galleries, utility rooms & access houses, process buildings & miscellaneous demolition - Contract 2, "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued Sep 3, 2026 · Permit 23 128815 PLB

    Permit issued
  • New building

    Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the existing Northwest and Southwest treatment plants - Contract 2, "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued Sep 3, 2026 · Permit 23 128815 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to construct new industrial buildings - including Northeast activated sludge treatment plant, new aeration Blower Building, new Main Switchgear Building, Access Buildings, Polymer Building, Biofilter Building, Hydraulic Power Unit (HPU) Buildings, Tunnels; new Blower Building for the existing Northwest and Southwest treatment plants - Contract 2, "Highland Creek Water Treatment Plant"

    Applied Mar 30, 2023 · issued Sep 3, 2026 · Permit 23 128815 HVA

    Permit issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Alterations to existing dewatering building

    Applied Aug 2, 2022 · Permit 22 154463 FSU

    Application on hold
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - The Highland Creek Fluidized Bed Incineration Project and South Facility Upgrades Project include the demolition of the existing Heat Treatment Building (under separate permit), and construction of a new Fluidized Bed Incinerator (FBI) Building. The new FBI building is 4-storeys. There are various upgrades to the plant infrastructure located on the south side of the railway tracks (the South Facility), including works adjacent to the FBI Building such as a gas cylinder hut and outdoor fuel oil storage tank.

    Applied Jul 29, 2022 · Permit 22 154444 FSU

    Application on hold
  • Plumbing

    Plumbing - Construction of the new Northeast (NE) Plant, a 110 ML/dconventional activated sludge treatment plant, a new high-voltage substation

    Applied Jun 9, 2022 · issued Nov 21, 2023 · Permit 22 154444 PLB

    Permit issued
  • Plumbing

    Plumbing - Alterations to existing dewatering building

    Applied Jun 9, 2022 · issued Dec 16, 2022 · Permit 22 154463 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Alterations to existing dewatering building

    Applied Jun 9, 2022 · issued Dec 15, 2022 · Permit 22 154463 HVA

    Permit issued
  • Heating and ventilation

    HVAC - Construction of the new Northeast (NE) Plant, a 110 ML/dconventional activated sludge treatment plant, a new high-voltage substation

    Applied Jun 9, 2022 · issued Nov 21, 2023 · Permit 22 154444 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Alterations to existing dewatering building

    Applied May 31, 2022 · issued Oct 26, 2022 · Permit 22 154463 BLD

    Inspections under way
  • New building

    The Highland Creek Fluidized Bed Incineration Project and South Facility Upgrades Project include the demolition of the existing Heat Treatment Building (under separate permit), and construction of a new Fluidized Bed Incinerator (FBI) Building. The new FBI building is 4-storeys. There are various upgrades to the plant infrastructure located on the south side of the railway tracks (the South Facility), including works adjacent to the FBI Building such as a gas cylinder hut and outdoor fuel oil storage tank.

    Applied May 31, 2022 · issued Nov 21, 2023 · Permit 22 154444 BLD

    Inspections under way
  • Demolition

    Demolish entire Heat Treatment Building (east building) down to basement floor plan. Demolition work excludes central portion (consists of basement and 2 storeys) between this east building and existing Incineration building on west side. The existing Incineration Building is to remain and will undergo major renovation work. The demolition work also includes partial demoltion of tanks and structures adjacent to the Heat Treatement Building.

    Applied Mar 9, 2022 · issued Jul 27, 2022 · Permit 22 120968 DEM

    Permit issued
  • Plumbing

    Plumbing - Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with removal of various building components, electrical upgrades and minor grading and landscape works.

    Applied Sep 30, 2020 · issued May 18, 2021 · completed Mar 31, 2025 · Permit 20 200717 PLB

    Closed
  • Addition or alteration · Multiple projects

    Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with removal of various building components, electrical upgrades and minor grading and landscape works.

    Applied Sep 30, 2020 · issued May 18, 2021 · completed Jun 10, 2025 · Permit 20 200717 BLD

    Closed
  • Heating and ventilation

    HVAC - Expansion and renovation to south effluent pumping station, disinfection building and storage plant building along with removal of various building components, electrical upgrades and minor grading and landscape works.

    Applied Sep 30, 2020 · issued May 18, 2021 · completed Mar 31, 2025 · Permit 20 200717 HVA

    Closed
  • Drains and site services · Site service

    construct influent chamber to service headworks building

    Applied Jun 2, 2020 · issued Jul 10, 2020 · completed Oct 24, 2024 · Permit 20 151560 STS

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new storage building, renovation of existing esterior concrete stairs, addition of new exterior car parking lots, addition to new exterior pathaway, and local site grading work to existing Water and Sewage Pumping Station.

    Applied Mar 25, 2019 · issued Aug 2, 2019 · completed Mar 26, 2025 · Permit 19 130360 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new storage building, renovation of existing esterior concrete stairs, addition of new exterior car parking lots, addition to new exterior pathaway, and local site grading work to existing Water and Sewage Pumping Station.

    Applied Mar 25, 2019 · issued Aug 2, 2019 · completed Mar 27, 2025 · Permit 19 130360 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct a new storage building, renovation of existing esterior concrete stairs, addition of new exterior car parking lots, addition to new exterior pathaway, and local site grading work to existing Water and Sewage Pumping Station.

    Applied Mar 25, 2019 · issued Aug 2, 2019 · completed Apr 2, 2025 · Permit 19 130360 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct four (4) new hydraulic unit buildings and renovation of below grade Tunnel No. 12.

    Applied Dec 21, 2018 · issued Feb 7, 2019 · completed Feb 5, 2025 · Permit 18 271087 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct four (4) new hydraulic unit buildings and renovation of below grade Tunnel No. 12.

    Applied Dec 21, 2018 · issued Feb 7, 2019 · completed Mar 27, 2025 · Permit 18 271087 HVA

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct four (4) new hydraulic unit buildings and renovation of below grade Tunnel No. 12.

    Applied Dec 21, 2018 · issued Feb 7, 2019 · completed Apr 2, 2025 · Permit 18 271087 BLD

    Closed
  • Addition or alteration · Multiple projects

    construct 4 access houses for water treatment plant, interior alteration to existing tunnels, concrete repair throughout existing South plant tunnels, plumbing for 6 new site trailersFC - Applicant has requested a modification to the scope of building permit. "Interior alteration to existing tunnels, concrete repair throughout existing south plant tunnels" are not part of this building permit (see email attached)

    Applied May 25, 2018 · issued Sep 12, 2018 · completed Apr 1, 2025 · Permit 18 165414 BLD

    Closed
  • Plumbing

    Plumbing - construct 4 access houses for water treatment plant, interior alteratio toexisting tunnels, concrete repair thorughout existing South plant tunnels, plumbing for 6 new site trailers

    Applied May 25, 2018 · issued Sep 12, 2018 · completed Mar 26, 2025 · Permit 18 165414 PLB

    Closed
  • Heating and ventilation

    HVAC - construct 4 access houses for water treatment plant, interior alteratio toexisting tunnels, concrete repair thorughout existing South plant tunnels, plumbing for 6 new site trailers

    Applied May 25, 2018 · issued Sep 12, 2018 · completed Mar 27, 2025 · Permit 18 165414 HVA

    Closed
  • Plumbing

    Plumbing - Proposed phosphorus removal (ferrous chloride) building within the wastewater treatment.

    Applied May 2, 2018 · issued Jul 9, 2018 · completed Feb 6, 2025 · Permit 18 152228 PLB

    Closed
  • Drains and site services · Site service

    Proposed site service work on wastewater treatment plant site to include undergroung services, catch basins, manholes and backflow devices.

    Applied May 2, 2018 · issued Jul 26, 2018 · completed Mar 27, 2025 · Permit 18 152327 STS

    Closed
  • New building

    Proposed phosphorus removal (ferrous chloride) building within the wastewater treatment.

    Applied May 2, 2018 · issued Jul 9, 2018 · completed Mar 31, 2025 · Permit 18 152228 BLD

    Closed
  • Demolition

    Proposed demolition of eight (8) aeration tank covers, four (4) access houses and ozonator building.

    Applied May 2, 2018 · issued Jun 6, 2018 · completed Jun 30, 2026 · Permit 18 152317 DEM

    Closed
  • Addition or alteration · Interior alterations

    Proposed upgrades to two RAS pumphouses (northwest and southwest). NW pumphouse scope includes lighting replacement, window and floor tiles upgrades, new unit heaters, fans, installation of new monorail (1.12m x 1.12m) equipment, new metal access hatch for the opening between the second and ground floor. SW pumphouse scope includes lighting replacement, window and floor tiles upgrades, new unit heaters.

    Applied May 2, 2018 · issued Aug 1, 2018 · completed Mar 6, 2025 · Permit 18 152270 BLD

    Closed
  • Addition or alteration · Interior alterations

    Old Plant Blower Building proposed upgrade works includes: remove and replace existing blowers and associated process piping, install new HVAC units on roof and in basement, upgrades to window and louvers upgrades and lighting replacement.

    Applied May 2, 2018 · issued Aug 23, 2018 · completed May 16, 2025 · Permit 18 152296 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed phosphorus removal (ferrous chloride) building within the wastewater treatment.

    Applied May 2, 2018 · issued Jul 9, 2018 · completed Feb 6, 2025 · Permit 18 152228 HVA

    Closed
  • Heating and ventilation

    HVAC - Proposed upgrades to two RAS pumphouses (northwest and southwest). NW pumphouse scope includes lighting replacement, window and floor tiles upgrades, new unit heaters, fans, installation of new monorail (1.12m x 1.12m) equipment, new metal access hatch for the opening between the second and ground floor. SW pumphouse scope includes lighting replacement, window and floor tiles upgrades, new unit heaters.

    Applied May 2, 2018 · issued Aug 1, 2018 · completed Feb 6, 2025 · Permit 18 152270 HVA

    Closed
  • Heating and ventilation

    HVAC - Old Plant Blower Building proposed upgrade works includes: remove and replace existing blowers and associated process piping, install new HVAC units on roof and in basement, upgrades to window and louvers upgrades and lighting replacement.

    Applied May 2, 2018 · issued Aug 23, 2018 · completed May 6, 2025 · Permit 18 152296 HVA

    Closed
  • Plumbing

    Plumbing - Old Plant Blower Building proposed upgrade works includes: remove and replace existing blowers and associated process piping, install new HVAC units on roof and in basement, upgrades to window and louvers upgrades and lighting replacement.

    Applied May 2, 2018 · issued Aug 23, 2018 · completed May 1, 2025 · Permit 18 152296 PLB

    Closed
  • Addition or alteration · Interior alterations

    REV 02 - Proposed Amendment of existing permit to delete the need for a existing room foyer to existing stairwell. Relocation of room fire riser to adjacent stairwell.INCINERATOR AND HEAT BUILDINGS: CHANGES TO FREIGHT & PASSENGER ELEVATORS AND REPLACEMENT OF HVAC AND PLUMBING PIPE UPGRADE

    Applied Nov 2, 2017 · issued Dec 15, 2017 · completed Jun 11, 2018 · Permit 12 268966 BLD (revision 02)

    Closed
  • Addition or alteration · Addition(s)

    REV #01 - Addition of one exterior door in new exterior east wall. Proposed eastward 1 storey addition for existing waste water treatment plant.

    Applied Aug 10, 2017 · issued Sep 6, 2017 · completed Sep 9, 2019 · Permit 16 128102 BLD (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    Proposed eastward 1 storey addition for existing waste water treatment plant.

    Applied Mar 15, 2016 · issued Apr 28, 2016 · completed Sep 9, 2019 · Permit 16 128102 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed eastward 1 storey addition for existing waste water treatment plant.

    Applied Mar 15, 2016 · issued Apr 28, 2016 · completed Nov 6, 2019 · Permit 16 128102 HVA

    Closed
  • Addition or alteration · Multiple projects

    Construction of office addition at highland creek treatment plant, repair to existing office

    Applied Sep 16, 2014 · issued Jan 14, 2015 · completed Feb 25, 2021 · Permit 14 222779 BLD

    Closed
  • Drains and site services · Inside and outside drains

    Install storm sewer and watermain (reroute) - construction of office addition at highland creek treatment plant, repair to existing office

    Applied Sep 16, 2014 · issued Jan 14, 2015 · Permit 14 222779 STS

    Inspections under way
  • Heating and ventilation

    Hvac - construction of office addition at highland creek treatment plant, repair to existing office

    Applied Sep 16, 2014 · issued Jan 14, 2015 · completed May 30, 2023 · Permit 14 222779 HVA

    Closed
  • Plumbing

    Plumbing - CONSTRUCTION OF OFFICE ADDITION AT HIGHLAND CREEK TREATMENT PLANT, REPAIR TO EXISTING OFFICE

    Applied Sep 16, 2014 · issued Jan 14, 2015 · Permit 14 222779 PLB

    Inspections under way
  • Plumbing

    REV. #1 - see drwgsPlumbing - INCINERATOR AND HEAT BUILDINGS: CHANGES TO FREIGHT & PASSENGER ELEVATORS AND REPLACEMENT OF HVAC AND PLUMBING PIPE UPGRADE

    Applied Apr 16, 2014 · issued Jun 10, 2014 · completed Apr 9, 2018 · Permit 12 268966 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV. #1 - see drwgs INCINERATOR AND HEAT BUILDINGS: CHANGES TO FREIGHT & PASSENGER ELEVATORS AND REPLACEMENT OF HVAC AND PLUMBING PIPE UPGRADE

    Applied Apr 16, 2014 · issued Jul 24, 2014 · completed Jun 11, 2018 · Permit 12 268966 BLD (revision 01)

    Closed
  • Heating and ventilation

    REV. #1 - see drwgsHVAC - INCINERATOR AND HEAT BUILDINGS: CHANGES TO FREIGHT & PASSENGER ELEVATORS AND REPLACEMENT OF HVAC AND PLUMBING PIPE UPGRADE

    Applied Apr 16, 2014 · issued Jun 10, 2014 · completed Feb 16, 2018 · Permit 12 268966 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing -REV01- New Washroom, clarification for Spatial seperation of Buildings, and clarification for Fire Rated Concrete Block and Exit Stairs.(new workshop building at highland creek water treatment plant)

    Applied Jul 23, 2013 · issued Sep 5, 2013 · Permit 12 101915 PLB (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Replace two motor control centres incl. demolition and refurbishment of two process pumps

    Applied Jul 11, 2013 · issued Nov 8, 2013 · Permit 13 202485 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Replace two motor control centres incl. demolition and refurbishment of two process pumps

    Applied Jul 11, 2013 · issued Oct 3, 2013 · Permit 13 202485 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Replace two motor control centres incl. demolition and refurbishment of two process pumps

    Applied Jul 11, 2013 · issued Dec 2, 2013 · Permit 13 202485 HVA

    Inspections under way
  • Drains and site services · Inside and outside drains

    Site services for new headworks building at existing waste water treatment plant

    Applied Mar 22, 2013 · issued Dec 12, 2013 · completed Apr 17, 2019 · Permit 13 133841 STS

    Closed
  • New building

    New headworks building at existing waste water treatment plant

    Applied Mar 15, 2013 · issued Apr 16, 2014 · completed May 14, 2019 · Permit 13 133841 BLD

    Closed
  • Heating and ventilation

    HVAC - New headworks building at existing waste water treatment plant

    Applied Mar 15, 2013 · issued Apr 16, 2014 · completed May 7, 2019 · Permit 13 133841 HVA

    Closed
  • Plumbing

    Plumbing - New headworks building at existing waste water treatment plant

    Applied Mar 15, 2013 · issued Apr 16, 2014 · completed Apr 17, 2019 · Permit 13 133841 PLB

    Closed
  • Plumbing

    Plumbing - INCINERATOR AND HEAT BUILDINGS: CHANGES TO FREIGHT & PASSENGER ELEVATORS AND REPLACEMENT OF HVAC AND PLUMBING PIPE UPGRADE

    Applied Oct 26, 2012 · issued Jan 25, 2013 · completed Apr 9, 2018 · Permit 12 268966 PLB

    Closed
  • Heating and ventilation

    Hvac - incinerator and heat buildings: changes to freight & passenger elevators and replacement of hvac and plumbing pipe upgrade

    Applied Oct 26, 2012 · issued Jan 29, 2013 · completed Feb 16, 2018 · Permit 12 268966 HVA

    Closed
  • Addition or alteration · Interior alterations

    Incinerator and heat buildings: changes to freight & passenger elevators and replacement of hvac and plumbing pipe upgrade

    Applied Oct 26, 2012 · issued Jan 25, 2013 · completed Jun 11, 2018 · Permit 12 268966 BLD

    Closed
  • Drains and site services · Inside and outside drains

    Drain - new workshop building at highland creek water treatment plant

    Applied May 24, 2012 · issued May 28, 2012 · Permit 12 101915 STS

    Inspections under way
  • Plumbing · Fixtures/Roof Drains: other

    Plumbing - new workshop building at highland creek water treatment plant

    Applied Apr 30, 2012 · issued Feb 11, 2013 · Permit 12 163297 PSA

    Permit issued
  • Plumbing

    Plumbing - temporary trailer for office use

    Applied Feb 23, 2012 · issued May 29, 2012 · Permit 12 126568 PLB

    Permit issued
  • Plumbing

    Plumbing - new workshop building at highland creek water treatment plant

    Applied Jan 5, 2012 · issued Apr 17, 2012 · Permit 12 101915 PLB

    Inspections under way
  • Addition or alteration · Other

    replace incinerator bypass stacks BTU 1 & 2

    Applied Oct 31, 2011 · issued Dec 20, 2011 · Permit 11 301735 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Demolish existing roof, replace with new roof and mechanical units

    Applied Apr 21, 2011 · issued Jun 28, 2011 · completed Nov 28, 2025 · Permit 11 180252 HVA

    Closed
  • Addition or alteration · Multiple projects

    Demolish existing roof, replace with new roof and mechanical units

    Applied Apr 21, 2011 · issued Jun 28, 2011 · Permit 11 180252 BLD

    Permit issued
  • New building

    To modify location of the building on siteConstruct new dechlorination building between the existing digesters complex and the existing effluent water storage facility. Area to the north of the new building be paved by ashphalt and the acess road in the vicinity is to be re-routed. Construct burried pipe corridor from new bldg. to existing pump station.

    Applied Aug 26, 2010 · issued Sep 13, 2010 · Permit 10 125077 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - interior/exterior upgrade to WAS Thickening Building, addition, interior alterations

    Applied Jun 9, 2010 · issued Nov 15, 2010 · completed Feb 7, 2017 · Permit 10 192503 PLB

    Closed
  • Addition or alteration · Multiple projects

    interior/exterior upgrade to Sludge Storage and Tanks, brick cladding, concrete, windows, doors roof drains

    Applied Jun 9, 2010 · issued Oct 1, 2010 · completed Jul 3, 2018 · Permit 10 192481 BLD

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Construct new dechlorination building between the existing digesters complex and the existing effluent water storage facility. Area to the north of the new building be paved by ashphalt and the acess road in the vicinity is to be re-routed. Construct burried pipe corridor from new bldg. to existing pump station.

    Applied Mar 2, 2010 · issued Aug 3, 2010 · Permit 10 125077 STS

    Inspections under way
  • Heating and ventilation

    HVAC - Construct new dechlorination building between the existing digesters complex and the existing effluent water storage facility. Area to the north of the new building be paved by ashphalt and the acess road in the vicinity is to be re-routed. Construct burried pipe corridor from new bldg. to existing pump station.

    Applied Mar 2, 2010 · issued Aug 3, 2010 · Permit 10 125077 HVA

    Inspections under way
  • New building

    Construct new dechlorination building between the existing digesters complex and the existing effluent water storage facility. Area to the north of the new building be paved by ashphalt and the acess road in the vicinity is to be re-routed. Construct burried pipe corridor from new bldg. to existing pump station.

    Applied Mar 2, 2010 · issued Jun 14, 2010 · Permit 10 125077 BLD

    Inspections under way
  • Plumbing

    Plumbing - Construct new dechlorination building between the existing digesters complex and the existing effluent water storage facility. Area to the north of the new building be paved by asphalt and the access road in the vicinity is to be re-routed. Construct buried pipe corridor from new bldg. to existing pump station.

    Applied Mar 2, 2010 · issued Aug 3, 2010 · Permit 10 125077 PLB

    Inspections under way
  • Plumbing

    Chlorination facility as part of wastewater treatment plant

    Applied May 5, 2009 · issued Sep 23, 2009 · completed Mar 23, 2026 · Permit 09 134060 PSA

    Closed
  • Addition or alteration · Interior alterations

    Revision of the existing truck bay area to include new rails and sump (Interior alterations to mechanical room to bring it up to code)

    Applied Jan 20, 2009 · issued Apr 30, 2010 · completed Mar 14, 2022 · Permit 08 163914 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - new building on existing concrete foundation

    Applied Jan 13, 2009 · issued Dec 10, 2009 · completed May 31, 2022 · Permit 09 100977 PLB

    Cancelled
  • New building

    New building on existing concrete foundation

    Applied Jan 7, 2009 · issued Dec 10, 2009 · completed May 31, 2022 · Permit 09 100977 BLD

    Cancelled
  • Heating and ventilation

    HVAC - alterations to office/lab area, replace hvac, new roof opening

    Applied Aug 18, 2008 · issued Nov 18, 2008 · Permit 08 194448 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    City of Toronto Water Treatment Plant.alterations to office/lab area, replace hvac, new roof opening

    Applied Aug 18, 2008 · issued Nov 18, 2008 · completed Jul 11, 2018 · Permit 08 194448 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to mechanical room to bring it up to code

    Applied May 29, 2008 · issued Jul 30, 2008 · Permit 08 163914 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to mechanical room to bring it up to code

    Applied May 29, 2008 · issued Jul 30, 2008 · completed Mar 14, 2022 · Permit 08 163914 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.