Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

51 Hillholm Rd

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision to increase number of air handling units from 7 to 9.

    Applied Apr 9, 2018 · issued Apr 20, 2018 · completed Oct 21, 2019 · Permit 16 109987 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to demolish existing dwelling and constructing new 3 storey detached single family dwelling with finished basement. (See also Demolition Permit 16-109989)

    Applied May 24, 2017 · issued Jun 5, 2017 · completed Oct 21, 2019 · Permit 16 109987 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to demolish existing dwelling and constructing new 3 storey detached single family dwelling with finished basement. (See also Demolition Permit 16-109989)

    Applied May 5, 2016 · issued May 5, 2016 · completed Oct 21, 2019 · Permit 16 109987 PLB

    Closed
  • Drains and site services

    Drain - Proposal to demolish existing dwelling and constructing new 3 storey detached single family dwelling with finished basement. (See also Demolition Permit 16-109989)

    Applied May 5, 2016 · issued May 5, 2016 · completed Oct 21, 2019 · Permit 16 109987 DRN

    Closed
  • New house · New building

    Proposal to demolish existing dwelling and constructing new 3 storey detached single family dwelling with finished basement. (See also Demolition Permit 16-109989)

    Applied Jan 28, 2016 · issued Apr 11, 2016 · completed Oct 21, 2019 · 1 home added · Permit 16 109987 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a circular driveway.

    Decision: Approved (hearing Jun 27, 2018)

    Filed Jan 24, 2018 · File A0093/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 13 Old Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a front integral garage (containing a car lift connecting to the basement level/below the front driveway), a rear enclosed walkout basement, a rear ground floor terrace with stairs, and a rear third storey balcony. Also, to construct a new circular driveway, abutting Old Forest Hill Road.

    180 m away · filed Jul 28, 2026 · Hearing scheduled

  • 168 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling (triplex) with a side (north) integral garage and a new driveway abutting Hillholm Road, a front covered porch with a roof overhang/canopy and stairs, a rear covered ground floor deck with stairs and a pergola, and rear second and third floor balconies. There will be three residential dwelling units on this lot (one unit occupying the basement level, one unit occupying the ground and the second levels, and one unit occupying the third level).

    230 m away · filed Nov 28, 2025 · Approved

  • 435 Russell Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with a front porch, a front below-grade integral garage, a rear ground floor terrace with stairs, a rear third storey balcony, and a rear in-ground swimming pool. Also, to construct a new one-storey detached ancillary building (cabana).

    230 m away · filed Sep 24, 2025 · Approved

  • 46 Hillholm Rd · Minor variance

    To permit a rear basement extension (the existing above ground floor patio will be maintained) of the existing three-storey detached dwelling, which is currently under construction (Building Permit File Number 22 224997 BLD).

    70 m away · filed Apr 25, 2025 · Approved

  • 62 Hillholm Rd · Minor variance

    To construct a new three-storey detached dwelling with a two-car integral garage, a front widened driveway, a front covered porch with stairs, a rear basement walkout, a rear ground floor covered deck, rear second and third floor balconies, and a rear in-ground swimming pool. Also, to construct a one-storey ancillary building (to contain a washroom and mechanical pool room) in the rear yard, abutting the pool.

    100 m away · filed Apr 10, 2025 · Approved

  • 71 Hillholm Rd · Minor variance

    To alter the existing two-and-one-half storey detached dwelling by constructing a one-storey front portico addition, a rear one-storey addition, and a rear second storey addition.

    160 m away · filed Jan 2, 2025 · Approved

  • 62 Hillholm Rd · Minor variance

    To construct a new three-storey detached dwelling with a front horseshoe driveway, a covered front porch with stairs, a rear covered deck, and an inground swimming pool. Also, to construct a one-storey ancillary building (to contain a washroom and mechanical pool room) in the rear yard, abutting the pool.

    100 m away · filed Dec 27, 2024 · Refused

  • 435 Russell Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with a front porch, a front below-grade integral garage with a basement walkout, a rear ground floor terrace with stairs, a rear third storey balcony, a rear yard cabana, and a rear in-ground swimming pool.

    230 m away · filed Oct 28, 2024 · Refused

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.