Toronto address · Ward 19, Beaches-East York
51 King Edward Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed interior renovations including removing load bearing wall
Applied May 12, 2022 · issued May 20, 2022 · completed Mar 22, 2023 · Permit 22 119567 HVA
- Closed
Plumbing
Plumbing - Proposed interior renovations including removing load bearing wall
Applied May 12, 2022 · issued May 12, 2022 · completed Mar 22, 2023 · Permit 22 119567 PLB
- Closed
Small residential project · Interior alterations
Proposed interior renovations including removing load bearing wall
Applied Mar 4, 2022 · issued Apr 4, 2022 · completed Mar 22, 2023 · Permit 22 119567 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
2078-2106 Danforth Avenue and 985 Woodbine Avenue
35 storeys · 601 homes · Mixed use
410 m away · Site plan · Under review · filed Dec 18, 2024
Neighbours’ Committee of Adjustment files within 250 m
105 Gledhill Ave · Minor variance
To permit and maintain the existing interlock paving area in the front yard which will be used as a front yard parking pad.
110 m away · filed Sep 19, 2025 · Approved
69 Oak Park Ave · Minor variance
To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the lot. There will be a total of two residential dwelling units on the lot (one dwelling unit occupying the main one-and-one-half storey detached dwelling and one dwelling unit occupying the ancillary building). The existing rear yard sheds will be demolished.
200 m away · filed May 27, 2025 · Deferred
33 Coleridge Ave · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a front covered porch with stairs, and a rear second floor deck with stairs.
210 m away · filed Feb 21, 2025 · Approved
101 King Edward Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two storey addition, a rear ground floor deck with stairs, a rear basement walkout and a roof top deck with an access stair enclosure. Also, to enclose the existing front porch.
180 m away · filed Oct 18, 2023 · Approved
189 Cedarvale Ave · Minor variance
To alter the existing six-storey apartment building by converting an existing laundry room and an existing lounge on the first floor into two additional dwelling units. Also, to construct long-term bicycle parking spaces outside the front of the building.
100 m away · filed Sep 20, 2023 · Approved
105 Gledhill Ave · Minor variance
To alter the existing two-storey detached dwelling by enlarging the front porch stairs. Also, to install a front yard parking pad.
110 m away · filed May 26, 2023 · Withdrawn
98 King Edward Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing rear and side two-storey additions, a complete second storey addition, a front ground floor porch and a Juliet balcony, a rear ground floor deck, a rear second storey balcony, and a rear basement walkout and stairs. There will be a secondary suite within the basement, and there will be a total of two units in this dwelling.
120 m away · filed Dec 20, 2022 · Approved
59 King Edward Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a partial rear one-storey addition with a rear deck and a complete second storey addition.
40 m away · filed Nov 18, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.