Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 22, Scarborough-Agincourt

51 Neddie Dr

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REVISION - to construct a new 2nd floorPlumbing - To construct a rear garden suite

    Applied Oct 2, 2023 · issued Oct 20, 2023 · Permit 22 216558 PLB (revision 01)

    Revision issued
  • Small residential project · New laneway / rear yard suite

    REVISION - to construct a new 2nd floorTo construct a rear garden suite

    Applied Oct 2, 2023 · issued Oct 20, 2023 · 1 home added · Permit 22 216558 BLD (revision 01)

    Revision issued
  • Drains and site services

    Drain - To construct a rear garden suite

    Applied Oct 13, 2022 · issued Apr 6, 2023 · Permit 22 216558 DRN

    Inspections under way
  • Plumbing

    Plumbing - To construct a rear garden suite

    Applied Oct 13, 2022 · issued Apr 19, 2023 · Permit 22 216558 PLB

    Inspections under way
  • Small residential project · New laneway / rear yard suite

    To construct a rear garden suite

    Applied Oct 13, 2022 · issued Feb 23, 2023 · 1 home added · Permit 22 216558 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 186 Allanford Rd · Minor variance

    To construct a three-storey apartment building with 10 dwelling units.

    130 m away · filed Aug 10, 2026 · Hearing scheduled

  • 46 Dempster St · Minor variance

    To demolish the existing dwelling and to construct a two-storey new dwelling.

    160 m away · filed Sep 10, 2024 · Approved

  • 119 Neddie Dr · Minor variance

    To convert the existing ancillary building into a Garden Suite. Cross reference previous Minor Variance applications #A214/08SC, #A0102/19SC & #A0157/19SC.

    150 m away · filed Mar 6, 2024 · Approved

  • 46 Dempster St · Minor variance

    To construct a new dwelling. Note this application was deferred on November 10, 2022 in order to allow the applicant the opportunity to address concerns identified by Community Planning.

    160 m away · filed Sep 6, 2022 · Approved

  • 44 Murmouth Rd · Minor variance

    To permit the retention/legalize the existing carport.

    210 m away · filed Nov 17, 2021 · Approved

  • 119 Neddie Dr · Minor variance

    This application is to permit the existing detached two-storey ancillary building in the rear yard to be used as a home office and storage loft. NOTE: At its hearing on May 10 2019, the Committee of Adjustment refused a minor variance application (A0102/20SC). The Committee's decision was not appealed to the Toronto Local Appeal Body (TLAB). This new minor variance application eliminates the food preparation area in the existing ancillary structure. Consideration of this application was rescheduled from the September 23, 2020 public hearing since proper notice was not issued under the Plannin…

    150 m away · filed Jun 5, 2019 · Approved

  • 119 Neddie Dr · Minor variance

    To permit a home office and storage loft in a two-storey building in the rear yard.

    150 m away · filed Apr 11, 2019 · Refused

  • 41 Murmouth Rd · Minor variance

    To construct a new single-car garage addition on the north side of the existing dwelling.

    220 m away · filed Dec 20, 2018 · Approved

Everything planned in Scarborough-Agincourt

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.