Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

52 Boon Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Walk-Out stair

    New Basement Walk-out Stairs in rear yard and alteration of existing Rear Porch

    Applied May 19, 2023 · issued Jun 21, 2023 · completed Feb 16, 2024 · Permit 23 148314 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Full port main line back water valve

    Applied May 2, 2023 · issued May 24, 2023 · completed May 26, 2023 · Permit 23 140745 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 133 Boon Ave · Minor variance

    To legalize and to maintain the rear fourth storey addition with a rooftop terrace (on the roof of the third storey), of the existing three-and-one-half-storey semi-detached dwelling (basement level is considered the first storey), that was constructed without an authorized building permit. Also, to permit the rear two-storey addition (located at the rear of the second and third storeys of the dwelling) that was constructed beyond the limits of an authorized building permit (19 212470 BLD 00 SR).

    210 m away · filed Jun 4, 2026 · Approved

  • 136 Ascot Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by enclosing the rear ground terrace into habitable space. The existing one-storey ancillary building (attached garage in the rear yard, abutting Nairn Avenue) will be maintained and unaltered.

    210 m away · filed Dec 2, 2024 · Approved

  • 70 Boon Ave · Minor variance

    To construct a parking pad in the front yard of the existing two-and-one-half-storey semi-detached dwelling.

    50 m away · filed Mar 28, 2023 · Withdrawn

  • 51 Ascot Ave · Minor variance

    To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting St. Clair Gardens) into a two-storey ancillary building (containing a two-car garage on the ground level, and one garden suite that will occupy the second level), by constructing a complete second storey addition with two second storey side (west) juliette balconies. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    140 m away · filed Oct 28, 2022 · Approved

  • 79 Nairn Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a new rear ground floor deck with stairs, and to reconstruct the front porch with stairs.

    170 m away · filed Oct 28, 2022 · Approved

  • 58 Nairn Ave · Minor variance

    To construct a rear one-storey ancillary building (detached garage) with a rooftop deck and an above-grade deck attached to the east side of the garage. This garage will be accessed from the public laneway (service lane).

    200 m away · filed Jan 20, 2022 · Approved

  • 124 Boon Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage) by constructing a second storey addition in order to install a laneway suite.

    190 m away · filed Nov 10, 2021 · Approved

  • 43 Norton Ave · Minor variance

    To construct a rear detached garage.

    170 m away · filed Aug 25, 2021 · Refused

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.