Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

52 Elmsthorpe Ave

The City of Toronto has 5 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Two storey dwelling with attached garage

    Applied Feb 18, 2021 · issued Feb 25, 2021 · completed May 13, 2022 · Permit 20 167454 HVA

    Closed
  • Demolition

    Demolish the existing two storey dwelling

    Applied Jul 14, 2020 · issued Oct 22, 2020 · 1 home removed · Permit 20 167459 DEM

    Inspections under way
  • Plumbing

    Plumbing - Two storey dwelling with attached garage

    Applied Jul 14, 2020 · issued Oct 22, 2020 · completed May 13, 2022 · Permit 20 167454 PLB

    Closed
  • New house · New building

    Two storey dwelling with attached garage

    Applied Jul 14, 2020 · issued Oct 22, 2020 · completed May 13, 2022 · 1 home added · Permit 20 167454 BLD

    Closed
  • Drains and site services

    Drain - Two storey dwelling with attached garage

    Applied Jul 14, 2020 · issued Oct 22, 2020 · completed May 25, 2022 · Permit 20 167454 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with front porch, rear ground floor deck, rear basement walkout and front integral garage.

    Decision: Approved (hearing Mar 11, 2020)

    Filed May 27, 2019 · File A0559/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 996 Avenue Rd · Minor variance

    To construct a new eight-storey detached residential building (multiplex), with a ground floor front entrance canopy, a rear ground floor terrace, rear balconies on the second to seventh storeys, front and rear rooftop terraces, and a rear outdoor amenity area on the eighth storey. There will be a total of 6 residential dwelling units on this lot. Also, there will be 1 surface visitor parking space in the rear yard, 12 parking spaces (including one accessible parking space), and 6 long-term bicycle parking spaces within a two-level underground parking garage (with elevator access). This appli…

    200 m away · filed Aug 11, 2026 · Hearing scheduled

  • 490 Eglinton Ave W · Minor variance

    Proposed change of use of the existing gymnasium to a retail store, together with interior alterations to combine with the existing retail space at 484 Eglinton Avenue West.

    200 m away · filed Jul 24, 2026 · Approved

  • 77 College View Ave · Minor variance

    To construct a new rear one-storey ancillary building (one-car detached garage, abutting College View Avenue).

    230 m away · filed May 15, 2026 · Approved

  • 66 Burnaby Blvd · Minor variance

    To alter the existing detached dwelling by constructing a third storey addition and converting into an apartment building with 5 dwelling units.

    250 m away · filed May 5, 2026 · Approved

  • 996 Avenue Rd · Minor variance

    To construct a new seven-storey detached residential building (multiplex), with a ground floor front entrance canopy, a rear ground floor terrace, rear balconies on the second to sixth levels, front and rear rooftop terraces, and a rear outdoor amenity area on the seventh level. There will be a total of 6 residential dwelling units on this lot. Also, there will be 1 surface visitor parking space in the rear yard, and a total of 12 parking spaces (of which 2 are accessible parking spaces), and 6 long-term bicycle parking spaces (to be provided within a two-level underground parking garage (wit…

    200 m away · filed Mar 10, 2026 · Approved

  • 996 Avenue Rd · Minor variance

    To construct a new six-storey detached residential building, with a ground floor front entrance canopy, a rear ground floor terrace, rear balconies on the second to sixth levels, a front rooftop terrace, and a rear rooftop access for the mechanical equipment (located above the sixth level). There will be a total of six residential dwelling units on this lot (sixplex). Also, there will be six resident parking spaces on the P1 Garage Level with access provided by a vehicular elevator, as well as one visitor parking space provided in the rear yard.

    200 m away · filed Aug 25, 2025 · Approved

  • 453 Eglinton Ave W · Minor variance

    To alter the existing two-storey mixed-use building by converting a portion of the basement-level storage space into two hotel units by converting the ground-level garage into one hotel unit and adding six hotel units to the second level. Also, the remaining storage space/boiler room/walk-in freezer within the basement level, as well as the existing non-residential uses (restaurant and clothing store) on the ground level, will be maintained and unaltered.

    130 m away · filed Aug 6, 2025 · Deferred

  • 91 Elmsthorpe Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front two-storey addition along the north side of the attached garage, a second storey partially above the existing garage, a front covered porch, a rear one-storey addition, and front and rear second storey balconies.

    50 m away · filed Jul 26, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.