Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 22, Scarborough-Agincourt

52 Emmeline Cres

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal for multiple projects (interior alterations, two storey addition, basement underpinning, walk-out stair and rear yard deck).

    Applied Nov 3, 2025 · issued Feb 9, 2026 · Permit 25 248520 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for multiple projects (interior alterations, two storey addition, basement underpinning, walk-out stair and rear yard deck)

    Applied Nov 3, 2025 · issued Feb 9, 2026 · Permit 25 248520 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for multiple projects (interior alterations, two storey addition, basement underpinning, walk-out stair and rear yard deck)

    Applied Nov 3, 2025 · issued Feb 9, 2026 · Permit 25 248520 PLB

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by extending the basement at the rear and constructing a full second storey addition, rear two-storey addition, front porch, rear basement walkout and rear deck.

    Decision: Approved (hearing Sep 10, 2025)

    Filed Jul 22, 2025 · File A0162/25SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 46 Emmeline Cres · Minor variance

    To construct a rear yard Garden Suite.

    60 m away · filed May 11, 2024 · Deferred

  • 50 Emmeline Cres · Minor variance

    To construct a 2 storey rear addition with rear deck and a detached garage. This application was previously deferred at the October 18th, 2023 hearing due to insufficient public notice.

    30 m away · filed Sep 5, 2023 · Approved

  • 2 Emmeline Cres · Minor variance

    To maintain the existing one-storey detached dwelling. Cross-Reference Consent application B0028/23SC and Minor Variance application A0157/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    230 m away · filed Jul 19, 2023 · Refused

  • 2 Emmeline Cres · Minor variance

    To permit the construction of a new, two-storey detached dwelling. Cross-Reference Consent application B0028/23SC and Minor Variance application A0156/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    230 m away · filed Jul 19, 2023 · Refused

  • 2 Emmeline Cres · Consent

    To sever the property into two residential lots. Cross-Reference Minor Variance Applications: A0156/23SC and A0157/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    230 m away · filed Jul 19, 2023 · Refused

  • 1069 Huntingwood Dr · Minor variance

    To construct a free-standing deck structure at the rear of the property.

    170 m away · filed Jun 29, 2021 · Approved

  • 82 Emmeline Cres · Minor variance

    To construct a new two-storey detached dwelling.

    250 m away · filed Dec 23, 2019 · Approved

  • 20 Emmeline Cres · Minor variance

    To construct a new two-storey detached dwelling.

    150 m away · filed May 2, 2019 · Approved

Everything planned in Scarborough-Agincourt

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.