Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

52 Fernwood Park Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed basement underpinning, basement alterations, interior alterations, third floor addition, terrace, rear deck and front canopy.

    Applied Nov 15, 2018 · issued Nov 15, 2018 · completed Aug 30, 2019 · Permit 18 178785 DRN

    Closed
  • Small residential project · Multiple projects

    Revision #01 - Second Floor Roof Dormers combined into one single larger dormer, front main floor bay window steel channel size reduction.Proposed basement underpinning, basement alterations, interior alterations, third floor addition, terrace, rear deck and front canopy.

    Applied Aug 21, 2018 · issued Aug 28, 2018 · completed Aug 30, 2019 · Permit 18 178785 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed basement underpinning, basement alterations, interior alterations, third floor addition, terrace, rear deck and front canopy.

    Applied Jun 15, 2018 · issued Jul 12, 2018 · completed Aug 30, 2019 · Permit 18 178785 HVA

    Closed
  • Plumbing

    Plumbing - Proposed basement underpinning, basement alterations, interior alterations, third floor addition, terrace, rear deck and front canopy.

    Applied Jun 15, 2018 · issued Jul 12, 2018 · completed Aug 30, 2019 · Permit 18 178785 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed basement underpinning, basement alterations, interior alterations, third floor addition, terrace, rear deck and front canopy.

    Applied Jun 15, 2018 · issued Jul 12, 2018 · completed Aug 30, 2019 · Permit 18 178785 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing 2½-storey detached dwelling by constructing a rear two-storey addition, a third storey addition, front porch, rear deck, and south side third storey terrace.

    Decision: Approved (hearing May 9, 2018)

    Filed Nov 13, 2017 · File A1250/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Selwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.

    240 m away · filed Sep 1, 2026 · Postponed

  • 26 Hazel Ave · Consent

    To obtain consent to create a new easement/right-of-way.

    90 m away · filed Feb 19, 2026 · Approved

  • 52 Balsam Ave · Consent

    To obtain consent to sever the property into two residential lots.

    140 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    140 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    140 m away · filed Feb 3, 2026 · Postponed

  • 34 Balsam Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    100 m away · filed Aug 25, 2025 · Approved

  • 29 Maclean Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).

    190 m away · filed Jul 30, 2025 · Approved

  • 32 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    60 m away · filed Jul 28, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.