Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

53 Kerr Rd

The City of Toronto has 2 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    BLD, PLB - Proposal to construct a rear one storey addition with minor alterations to the ground floor.

    Applied Sep 20, 2019 · issued Oct 3, 2019 · Permit 19 224721 BLD

    Inspections under way
  • Plumbing

    Plumbing - BLD, PLB - Proposal to construct a rear one storey addition with minor alterations to the ground floor.

    Applied Sep 20, 2019 · issued Oct 3, 2019 · Permit 19 224721 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition.

    Decision: Approved (hearing Jan 23, 2019)

    Filed Oct 17, 2018 · File A0971/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 38 Kerr Rd · Minor variance

    To construct a new rear two-storey detached ancillary building (garden suite) with a basement, and a cantilevered second storey with a side (east) juliet balcony. There will be two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    60 m away · filed Aug 20, 2026 · Postponed

  • 53 Highfield Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing complete second and third storey additions, front and rear two-storey additions, front and rear third storey rooftop balconies, and a rear ground floor balcony. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the first, second, and third levels).

    210 m away · filed Dec 2, 2025 · Approved

  • 44 Kent Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition, and a rear ground floor deck with stairs.

    240 m away · filed Aug 14, 2025 · Approved

  • 46 Kerr Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a deck and stairs.

    40 m away · filed Apr 16, 2025 · Approved

  • 54 Kerr Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the front porch into habitable space, and to constructing a new front porch with stairs, a rear two-storey addition with a new ground level deck.

    40 m away · filed Apr 14, 2025 · Approved

  • 56 Greenwood Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition and a rear second storey balcony.

    220 m away · filed Sep 20, 2024 · Approved

  • 28 Kent Rd · Minor variance

    To legalize and to maintain the existing rear one-storey addition and to permit the existing rear one-storey ancillary structure (shed), rear ground floor decks, and rear yard landscaping, which were constructed without an authorized building permit.

    250 m away · filed Aug 30, 2024 · Approved

  • 36 Kerr Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front porch landing and stairs.

    50 m away · filed Oct 23, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.