Toronto address · Ward 19, Beaches-East York
530 Main St
The City of Toronto has 6 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Proposed new two storey Garden Suite.
Applied Sep 8, 2025 · issued Sep 9, 2025 · completed Dec 15, 2025 · Permit 23 181117 DRN
- Inspections under way
Small residential project · New laneway / rear yard suite
Proposed new two storey Garden Suite.
Applied Jul 28, 2023 · issued Aug 18, 2025 · 1 home added · Permit 23 181117 BLD
- Permit issued
Heating and ventilation
HVAC - Proposed garden suite new floor area = 113.64 Coverage = 56.82 m2.
Applied Jul 28, 2023 · issued Aug 28, 2025 · Permit 23 181117 HVA
- Inspections under way
Plumbing
Plumbing - Proposed garden suite new floor area = 113.64 Coverage = 56.82 m2.
Applied Jul 28, 2023 · issued Aug 18, 2025 · Permit 23 181117 PLB
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of a back water valve
Applied Nov 17, 2021 · issued Nov 18, 2021 · completed Nov 23, 2021 · Permit 21 238681 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only)
Applied May 29, 2017 · issued May 29, 2017 · completed Mar 24, 2026 · Permit 17 167944 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-storey detached ancillary building (containing one garden suite) in the rear yard.
Decision: Approved (hearing Jun 12, 2024)
Filed Apr 17, 2024 · File A0371/24TEY
What’s planned nearby
Development sites within 500 m
- Under review
90 Eastdale Avenue and 2 Secord Avenue
41 storeys · 547 homes · Residential
440 m away · Site plan · Under review · filed Jul 10, 2024
Neighbours’ Committee of Adjustment files within 250 m
343 Lumsden Ave · Minor variance
To construct a new one-storey detached ancillary building (workshop and storage) in the rear yard of the property containing the existing one-storey detached dwelling. The existing metal shed and semi-detached garage in the rear yard will be demolished.
180 m away · filed Jul 30, 2026 · Hearing scheduled
54 Westbrook Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch with stairs, a front integral garage, and a front driveway abutting Westbrook Avenue.
220 m away · filed Jun 25, 2026 · Approved
560 Main St · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard of the lot containing the existing main detached dwelling. The existing frame shed and detached garage with shed will be demolished.
110 m away · filed Dec 8, 2025 · Approved
378 Lumsden Ave · Minor variance
To construct a two-storey ancillary building (containing one garden suite) with front and rear stars, in the rear yard of the property. The existing ancillary building (bunkie) will be demolished, and the existing shed will be maintained and unaltered. There will be a total of two residential dwelling units on the lot (one dwelling unit within the main house and one dwelling unit within the garden suite).
90 m away · filed May 9, 2025 · Application withdrawn
50 Westbrook Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with front and rear second storey balconies, and front and rear porches with stairs. The second and third storeys will be cantilevered on the east side of the dwelling. There will be a total of four residential dwelling units on this lot.
220 m away · filed May 6, 2025 · Approved
246 Chisholm Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a front one-storey addition (porch enclosure), front entrance stairs, and a front basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit located on the ground floor).
120 m away · filed Apr 4, 2025 · Approved
50 Westbrook Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, front and rear balconies on the second and third storeys, a rear basement walkout, and a rear ground floor deck. Also, to construct a new driveway, abutting Westbrook Avenue. There will be a total of four residential dwelling units on this lot (fourplex).
220 m away · filed Dec 31, 2024 · Refused
29 Hamstead Ave · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a front covered porch and stairs. The existing one-storey dwelling, and rear detached shed will be demolished.
220 m away · filed Jul 24, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.