Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

535 Russell Hill Rd

The City of Toronto has 7 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Nov 5, 2024 · issued Nov 25, 2024 · Permit 23 192370 HVA

    Inspections under way
  • New house · New building

    Revision 02: adding theatre room below the garage and update wooden Structure to metalRevision #01 - Proposed 3rd floor plan, roof update and removing the pool. Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Aug 19, 2024 · issued Oct 23, 2024 · 1 home added · Permit 23 192370 BLD (revision 02)

    Revision issued
  • New house · New building

    Revision #01 - Proposed 3rd floor plan, roof update and removing the pool. Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Apr 29, 2024 · issued May 22, 2024 · Permit 23 192370 BLD (revision 01)

    Revision issued
  • New house · New building

    Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Aug 22, 2023 · issued Nov 20, 2023 · 1 home added · Permit 23 192370 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Aug 22, 2023 · issued Nov 20, 2023 · Permit 23 192370 PLB

    Inspections under way
  • Demolition

    Proposal to demolish existing detached dwelling.

    Applied Aug 22, 2023 · issued Dec 1, 2023 · completed Sep 15, 2025 · 1 home removed · Permit 23 192397 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Applied Aug 22, 2023 · issued Nov 20, 2023 · completed Aug 14, 2026 · Permit 23 192370 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new three-storey detached dwelling with an integral garage, a rear third storey terrace, a front second storey balcony, and a swimming pool utility room at the basement level.

    Decision: Approved (hearing Apr 19, 2023)

    Filed Nov 15, 2022 · File A1295/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 490 Eglinton Ave W · Minor variance

    Proposed change of use of the existing gymnasium to a retail store, together with interior alterations to combine with the existing retail space at 484 Eglinton Avenue West.

    220 m away · filed Jul 24, 2026 · Approved

  • 570 Eglinton Ave W · Minor variance

    To alter the existing apartment building by converting two non-residential spaces (retail unit and storage room) in the basement into two additional dwelling units.

    160 m away · filed Aug 27, 2025 · Deferred

  • 301 Chaplin Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and a rear ground level deck with stairs.

    120 m away · filed Feb 7, 2025 · Approved

  • 12 Ormsby Cres · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a front porch with a canopy above, a rear ground floor covered terrace with stairs (covered outdoor room), a rear third floor balcony, and a rear yard in-ground swimming pool and hot tub.

    250 m away · filed Apr 19, 2024 · Approved

  • 326 Warren Rd · Minor variance

    To construct a new three-storey detached dwelling with an above grade basement, a front porch, a front two-car integral garage, and a rear second storey deck with stairs.

    50 m away · filed Feb 6, 2024 · Approved

  • 27 Tarlton Rd · Minor variance

    To construct a new three-storey detached dwelling, with a front integral garage, a front covered porch and stairs, a rear ground floor deck and stairs, as well as a rear basement walkout. The existing two-storey dwelling, and the one-storey ancillary building (garage) will be demolished.

    190 m away · filed Sep 26, 2023 · Approved

  • 27 Latimer Ave · Minor variance

    Proposal to construct a new dwelling.

    140 m away · filed Sep 18, 2023 · Approved

  • 24 Heddington Ave · Minor variance

    Proposal to construct a new dwelling

    180 m away · filed May 30, 2023 · approved on condition

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.