Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

54 Baycrest Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposed: Second storey addition, Interior alterations - main and basement, basement walkout, new porch, new deck, and secondary suite in basement.

    Applied Sep 22, 2021 · issued Sep 22, 2021 · completed Oct 7, 2021 · Permit 20 223256 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposed: Second storey addition, Interior alterations - main and basement, basement walkout, new porch, new deck, and secondary suite in basement.

    Applied Nov 27, 2020 · issued Mar 4, 2021 · completed Oct 4, 2022 · Permit 20 223256 HVA

    Closed
  • Plumbing

    Plumbing - Proposed: Second storey addition, Interior alterations - main and basement, basement walkout, new porch, new deck, and secondary suite in basement.

    Applied Nov 27, 2020 · issued Mar 4, 2021 · completed Oct 11, 2022 · Permit 20 223256 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed: Second storey addition, Interior alterations - main and basement, basement walkout, new porch, new deck, and secondary suite in basement.

    Applied Nov 27, 2020 · issued Mar 4, 2021 · completed Nov 8, 2023 · Permit 20 223256 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new addition to the existing dwelling as well as a new two storey addition to the rear and west side of the existing dwelling.

    Decision: Approved (hearing Aug 20, 2020)

    Filed Apr 15, 2020 · File A0202/20NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 57 Sultana Ave · Minor variance

    To legalize and maintain the habitable space in the converted integral garage and to permit a wood deck.

    160 m away · filed Aug 5, 2025 · Approved

  • 28 Sultana Ave · Minor variance

    To demolish the existing garage and construct a new two storey garden suite.

    190 m away · filed Jul 22, 2025 · Approved

  • 31 Baycrest Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey rear addition.

    160 m away · filed Jun 6, 2025 · Approved

  • 80 Sultana Ave · Minor variance

    To construct a new fourplex dwelling. Note: This application was previously deferred at the Committee of Adjustment hearing on May 1, 2025.

    190 m away · filed Mar 4, 2025 · Approved

  • 58 Baycrest Ave · Minor variance

    To permit an increase in driveway width and a reduction in front yard soft landscaping.

    30 m away · filed Sep 6, 2024 · Refused

  • 32 Sultana Ave · Minor variance

    To construct a new 2 storey dwelling with rear deck and walk-out.

    180 m away · filed Jan 19, 2024 · Approved

  • 44 Sultana Ave · Minor variance

    Proposal to construct a new dwelling. Please note, this application was deferred June 8, 2023 to revise plans.

    130 m away · filed Apr 27, 2023 · Approved

  • 20 Wasdale Cres · Minor variance

    Proposal to construct a one-storey garden suite.

    230 m away · filed Mar 15, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.