Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

54 St Magnus Dr

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - construct a new two storey dwelling, with rear deck and basement walkout and new front porch

    Applied Apr 19, 2022 · issued Jun 2, 2022 · completed Apr 12, 2023 · Permit 22 135934 HVA

    Closed
  • Plumbing

    Plumbing - construct a new two storey dwelling, with rear deck and basement walkout and new front porch

    Applied Apr 19, 2022 · issued Jun 2, 2022 · completed Apr 12, 2023 · Permit 22 135934 PLB

    Closed
  • New house · New building

    construct a new two storey dwelling, with rear deck and basement walkout and new front porch

    Applied Apr 19, 2022 · issued Jun 2, 2022 · completed Jun 28, 2024 · 1 home added · Permit 22 135934 BLD

    Closed
  • Drains and site services

    Drain - construct a new two storey dwelling, with rear deck and basement walkout and new front porch

    Applied Apr 19, 2022 · issued Jun 2, 2022 · completed Jun 9, 2022 · Permit 22 135934 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached house on a vacant lot.

    Decision: Approved (hearing Aug 16, 2018)

    Filed Jun 21, 2018 · File A0223/18SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Brumwell St · Minor variance

    To construct a detached garage in the north side yard. The existing dwelling will remain unaltered.

    180 m away · filed Mar 27, 2026 · Approved

  • 376 Centennial Rd · Minor variance

    To alter the existing one-storey dwelling by constructing a front two-storey addition with a front porch. There will be a total of two dwelling units on the property.

    180 m away · filed Aug 25, 2025 · Approved

  • 52 Brumwell St · Minor variance

    To construct a detached garage and to construct a new rear yard second-storey deck and a new rear ground floor patio to the existing three-storey dwelling.

    180 m away · filed Jan 29, 2025 · Approved

  • 48 Brumwell St · Consent

    Lot Line Adjustment seeking to sever 48 Brumwell Street and transfer 1,489.2 m2 to 52 Brumwell Street. Cross-Reference Minor Variance Application: A0086/23SC

    160 m away · filed Mar 28, 2023 · Refused

  • 48 Brumwell St · Minor variance

    Cross-Reference Consent Application: B0014/23SC

    160 m away · filed Mar 28, 2023 · Refused

  • 35 Brumwell St · Consent

    To obtain consent to sever the property into two residential lots (Part 1 and Part 2).

    220 m away · filed Aug 25, 2021 · Approved

  • 35 Brumwell St · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    220 m away · filed Aug 25, 2021 · Approved

  • 35 Brumwell St · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    220 m away · filed Aug 25, 2021 · Approved

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.