Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

540 Mount Pleasant Rd

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal to change the use from offices to two dwelling units on second floor of the existing building.

    Applied Feb 5, 2021 · completed Jul 28, 2021 · 2 homes added · Permit 21 113227 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to change the use from offices to two dwelling units on second floor of the existing building.

    Applied Feb 5, 2021 · completed Jul 28, 2021 · Permit 21 113227 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal to change the use from offices to two dwelling units on second floor of the existing building.

    Applied Feb 5, 2021 · completed Jul 28, 2021 · Permit 21 113227 PLB

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 369 Millwood Rd · Minor variance

    To construct a new detached dwelling with a rear deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on August 20, 2026.

    230 m away · filed Jun 3, 2026 · Hearing scheduled

  • 35 Hadley Rd · Minor variance

    To legalize and maintain the existing conditions with respect to soft landscaping at the front and rear yard of the property and Floor Space Index. Please note, the application was deferred on June 4, 2026, to allow the applicant to discuss the file with City Planning and the Neighbours.

    180 m away · filed Dec 11, 2025 · modified approval

  • 522 Mount Pleasant Rd · Minor variance

    To alter the existing three-storey commercial building by constructing a front entrance accessible ramp, a complete fourth storey addition with a side (south) courtyard, and a staircase enclosure on the rooftop level. This building will contain medical office and personal service shop uses. There will be two accessible parking spaces, and one standard parking space provided on-site.

    60 m away · filed Nov 5, 2025 · Approved

  • 171 Belsize Dr · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, rear basement/ground floor deck with exterior stairs, and a rear basement walkout.

    60 m away · filed Jun 7, 2023 · Approved

  • 551 Mount Pleasant Rd · Minor variance

    Proposal to renovate and partially reconstruct existing theatre with a three-storey rear addition. This proposal is an expansion of a legal non-conforming use of an entertainment place of assembly. A related Site Plan Approval Application 23 110086 NNY 15 SA is currently under review. This application was previously deferred on June 22nd, 2023 to allow the applicant to discuss and meet with the neighbors.

    70 m away · filed Mar 31, 2023 · Refused

  • 180 Belsize Dr · Minor variance

    To complete the construction of a rear yard deck.

    100 m away · filed Nov 28, 2022 · Approved

  • 369 Millwood Rd · Minor variance

    Proposal to construct a second floor addition. This application was deferred sine die at the Committee of Adjustment meeting on January 19, 2023.

    230 m away · filed Oct 20, 2022 · Approved

  • 126 Belsize Dr · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition with a rear balcony, a one-storey rear addition and an enclosed front porch.

    70 m away · filed Jan 21, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.