Toronto address · Ward 13, Toronto Centre
549 Parliament St
The City of Toronto has 11 building permits since 2017 (11 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Addition or alteration · Multiple projects
Revision 04: Revision to permit, updating fire alarm and sprinkler layoutRevision 03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator from Ground floor to 3rd floor for the use of Unit #3, Roof access stair and enclosure, cladding change at 4th floor (from stucco to metal siding)Revision 02 - Partial 4th storey at rear (east side), Dwelling Unit #3 to become a storey unit (no changes in unit count), interior layout changes to suit as-built, structural upgrades to accommodate additional storey.Revision 01 - roof…
Applied Aug 24, 2026 · Permit 24 213893 BLD (revision 04)
- Not started
Heating and ventilation
Revision 01: Revision to permitHVAC - To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Aug 24, 2026 · Permit 24 213893 HVA (revision 01)
- Revision issued
Plumbing
Revision 01: Revision to permitPlumbing - To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Aug 24, 2026 · issued Sep 24, 2026 · Permit 24 213893 PLB (revision 01)
- Revision issued
Addition or alteration · Multiple projects
REV03: Proposed revision - scope of revision includes Unit #3 (partial 3rd floor and 4th floor) interior layout changes, Private elevator from Ground floor to 3rd floor for the use of Unit #3, Roof access stair and enclosure, cladding change at 4th floor (from stucco to metal siding)Revision 02 - Partial 4th storey at rear (east side), Dwelling Unit #3 to become a storey unit (no changes in unit count), interior layout changes to suit as-built, structural upgrades to accommodate additional storey.----------------------------------------------------Rev 01 - roof access stair and enclosure (no…
Applied Apr 16, 2026 · issued May 19, 2026 · Permit 24 213893 BLD (revision 03)
- Permit issued
Drains and site services · Inside and outside drains
Drain - To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Jul 31, 2025 · issued Aug 21, 2025 · Permit 24 213893 STS
- Revision issued
Addition or alteration · Multiple projects
Revision 02 - Partial 4th storey at rear (east side), Dwelling Unit #3 to become a storey unit (no changes in unit count), interior layout changes to suit as-built, structural upgrades to accommodate additional storey.----------------------------------------------------Rev 01 - roof access stair and enclosure (no occupancy on roof, maintenance only)To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Jun 18, 2025 · issued Nov 10, 2025 · Permit 24 213893 BLD (revision 02)
- Revision issued
Addition or alteration · Multiple projects
Rev 01 - roof access stair and enclosure (no occupancy on roof, maintenance only)To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Mar 20, 2025 · issued Apr 25, 2025 · Permit 24 213893 BLD (revision 01)
- Permit issued
Heating and ventilation
HVAC - To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Dec 5, 2024 · issued Jan 10, 2025 · Permit 24 213893 HVA
- Permit issued
Plumbing
Plumbing - To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Dec 5, 2024 · issued Jan 10, 2025 · Permit 24 213893 PLB
- Inspections under way
Addition or alteration · Multiple projects
To construct a rear addition, one storey front addition, basement underpinning, interior alterations - ground floor retail space (for future tenant) - four residential units
Applied Sep 17, 2024 · issued Jan 10, 2025 · Permit 24 213893 BLD
- Inspections under way
Addition or alteration · Underpinning
To demolish existing framed rear additions and underpinning original masonary foundation wall to accomodate future rear addition
Applied Jul 31, 2023 · issued Nov 13, 2023 · Permit 23 182563 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 60 homes · Mixed use
170 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
400 m away · Site plan · Under review · filed Apr 27, 2022
- Submitted
- Under appeal
39 storeys · 378 homes · Residential
470 m away · Site plan · Under appeal · filed Jul 6, 2023
- Under review
11 storeys · Mixed use
480 m away · Site plan · Under review · filed May 26, 2026
Neighbours’ Committee of Adjustment files within 250 m
21 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.
180 m away · filed Mar 11, 2026 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
210 m away · filed Sep 4, 2024 · Approved
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
180 m away · filed Jul 18, 2024 · Approved
17 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.
190 m away · filed Apr 22, 2024 · Approved
49 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by demolishing the existing front covered porch, constructing a new covered front porch with stairs and relocating the air conditioner unit from the front of the lot (encroaching beyond the front yard lot line) to the front corner of the lot (partially encroaching beyond the front yard lot line), as approved by Minor Variance Decision A1380/22TEY. This current application is necessitated to correctly identify variances that were not included in the previous Minor Variance Decision.
110 m away · filed Dec 28, 2023 · Approved
51 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).
120 m away · filed Dec 6, 2023 · Approved
37 Winchester St · Consent
To sever the existing lot into two lots and to create a new easement.
110 m away · filed May 11, 2023 · Approved
435 Sackville St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new rear ground floor solarium.
240 m away · filed Apr 17, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.