Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

55 Chine Dr

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Pool fence enclosure

    Proposed Pool Fence Enclosure

    Applied Jun 14, 2017 · issued Jun 22, 2017 · completed Jun 22, 2017 · Permit 17 180413 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to demolish existing second floor, to construct new two storey rear addition, new second floor addition, replace existing ground floor joists, finish basement, new porch, rear deck and basement walk-out.

    Applied Sep 16, 2014 · issued May 19, 2015 · completed Jan 5, 2017 · Permit 14 222686 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to demolish existing second floor, to construct new two storey rear addition, new second floor addition, replace existing ground floor joists, finish basement, new porch, rear deck and basement walk-out.

    Applied Sep 16, 2014 · issued Nov 26, 2014 · completed Jan 5, 2017 · Permit 14 222686 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to demolish existing second floor, to construct new two storey rear addition, new second floor addition, replace existing ground floor joists, finish basement, new porch, rear deck and basement walk-out.

    Applied Sep 16, 2014 · issued Nov 26, 2014 · completed Jan 6, 2017 · Permit 14 222686 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 84 Cliffcrest Dr · Minor variance

    To construct a new two-storey detached dwelling with a secondary basement suite, an integral garage, front porch, rear basement walkout with terrace and a ground floor rear covered deck. The existing one-storey detached dwelling and detached garage will be demolished.

    230 m away · filed Jan 22, 2025 · Approved

  • 45 Chine Dr · Minor variance

    100 m away · filed Jan 14, 2025 · Application withdrawn

  • 45 Chine Dr · Minor variance

    100 m away · filed Jan 14, 2025 · Application withdrawn

  • 45 Chine Dr · Consent

    To obtain consent to sever the property into two residential lots and to create easements/rights-of-way. The existing one-and-one-half-storey detached dwelling and detached garage will be demolished. Cross-reference Minor Variance Applications A0020/25SC and A0021/25SC.

    100 m away · filed Jan 14, 2025 · Application withdrawn

  • 36 Cliffcrest Dr · Minor variance

    To demolish the existing dwelling and to construct a new two-storey detached dwelling.

    210 m away · filed Dec 18, 2024 · Approved

  • 68 Cliffcrest Dr · Minor variance

    To revise and make alterations to existing rear deck.

    220 m away · filed Nov 23, 2021 · Approved

  • 87 Cliffcrest Dr · Minor variance

    To construct a new two-storey detached dwelling.

    170 m away · filed Feb 1, 2021 · Approved

  • 99 Cliffcrest Dr · Minor variance

    The owner is seeking relief from the Zoning By-law to demolish and reconstruct the rear deck.

    190 m away · filed Jan 30, 2019 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.