Toronto address · Ward 11, University-Rosedale
55 Harbord St
U of T Athletic Centre
The City of Toronto has 10 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposed interior alterations of an existing testing lab on the second floor of Warren Stevens building
Applied Apr 28, 2020 · issued Jun 1, 2020 · completed May 19, 2021 · Permit 20 139675 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations of an existing testing lab on the second floor of Warren Stevens building
Applied Apr 28, 2020 · issued May 28, 2020 · completed Jun 24, 2021 · Permit 20 139675 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations of an existing testing lab on the second floor of Warren Stevens building
Applied Apr 28, 2020 · issued Jun 1, 2020 · completed May 19, 2021 · Permit 20 139675 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install backflow prevention device for Athletic Facilities in existing university.
Applied Apr 11, 2019 · issued May 22, 2019 · completed Dec 11, 2020 · Permit 19 138761 PSA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the second level of the Warren Stevens building. unit 2013
Applied Mar 26, 2019 · issued Apr 24, 2019 · completed Jan 27, 2020 · Permit 19 131169 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the second level of the Warren Stevens building. unit 2013
Applied Mar 26, 2019 · issued Apr 24, 2019 · completed Dec 5, 2019 · Permit 19 131169 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the second level of the Warren Stevens building. unit 2013
Applied Mar 26, 2019 · issued Apr 24, 2019 · completed Feb 18, 2020 · Permit 19 131169 BLD
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal for interior alterations to classroom & physiotherapy treatment area, "University of Toronto"
Applied Mar 2, 2016 · issued May 28, 2020 · completed May 28, 2020 · Permit 16 114076 FSU
- Inspections under way
Addition or alteration · Other
Proposal to install solar thermal panels for domestic hot water for University of Toronto's new Athletic Complex.
Applied Aug 24, 2009 · issued Oct 7, 2009 · Permit 09 161560 BLD
- Closed (dormant)
Heating and ventilation
HVAC - Interior alterations to existing coffee shop 'Starbucks'
Applied Aug 8, 2007 · issued Sep 5, 2007 · completed Jun 8, 2026 · Permit 07 251243 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 109 homes · Mixed use
470 m away · Site plan · Under review · filed Apr 20, 2022
- Under review
30 storeys · 472 homes · Mixed use
490 m away · Site plan · Under review · filed Oct 12, 2022
- Under review
37 storeys · 366 homes · Mixed use
500 m away · Site plan · Under review · filed Dec 7, 2021
Neighbours’ Committee of Adjustment files within 250 m
356 Huron St · Minor variance
To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).
130 m away · filed Oct 23, 2025 · Approved
108 Harbord St · Minor variance
To alter the existing two-storey mixed-use building by constructing a rear three-storey addition with a ground floor one-car garage (abutting the laneway). The side (east) second and third storey portions of the rear addition will be partially cantilevered above the exterior passageway. The existing office space on the ground floor, as well as the two residential dwelling units on the second and third levels will be maintained.
220 m away · filed Jun 17, 2025 · Approved
648 Spadina Ave · Minor variance
To alter the existing two-storey commercial building by increasing the permitted non-residential gross floor area for the restaurant use (through interior alterations).
130 m away · filed Sep 15, 2024 · Approved
96 Willcocks St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a three-storey rear addition (with a basement) and a third storey rear balcony. There will be no parking space on-site.
250 m away · filed Apr 20, 2023 · Approved
83 Harbord St · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway (Porretta Lane).
180 m away · filed Aug 24, 2022 · Approved
98 Willcocks St · Minor variance
To construct a two-storey rear addition with a rear basement walk-out.
250 m away · filed Jul 30, 2022 · Approved
112 Harbord St · Minor variance
To alter the existing two-and-one-half-storey mixed-use building by constructing a complete third storey addition, with a rear second storey deck, and a rooftop deck. Also, to occupy the basement and ground level with a commercial use (restaurant) and to occupy the second and third levels with two residential units.
230 m away · filed Jun 17, 2022 · Approved
78 Willcocks St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by relocating the staircase leading to the third storey. The two lawfully existing dwelling units will be maintained.
210 m away · filed Jul 9, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.