Toronto address · Ward 20, Scarborough Southwest
55 McDonald Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision 01 - As built drawings for this application incliudedHVAC - Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Jan 30, 2024 · issued Feb 2, 2024 · completed Jun 3, 2025 · Permit 21 141920 HVA (revision 01)
- Closed
Plumbing
Plumbing - Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Nov 13, 2023 · issued Nov 13, 2023 · completed Jun 3, 2025 · Permit 21 141920 PLB
- Closed
Drains and site services
Drain - Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Nov 13, 2023 · issued Nov 13, 2023 · completed Jun 6, 2025 · Permit 21 141920 DRN
- Closed
Small residential project · Addition(s)
Revision 01 - Sunroom addition located in front porch with structural updates.Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Jul 12, 2023 · issued Nov 27, 2023 · completed Jun 5, 2025 · Permit 21 141920 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Jul 14, 2022 · issued Jul 22, 2022 · completed Jun 3, 2025 · Permit 21 141920 HVA
- Closed
Small residential project · Addition(s)
Proposal for a front addition on basement level, first floor and new second floor in the existing detached single family dwelling.
Applied Apr 16, 2021 · issued Nov 15, 2021 · completed Jun 5, 2025 · Permit 21 141920 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
594 Warden Ave · Minor variance
Proposed front and rear addition including interior alterations to existing dwelling. Demolition of front sunroom and rear addition. New house by way of renovation.
60 m away · filed Sep 2, 2026 · Accepted
141 Leyton Ave · Consent
To obtain consent to sever the property into two residential lots. The Committee of Adjustment previously approved the severance of the land into 2 lots in 2021 under Decision B0014/20SC. However, the provisional consent of this application lapsed because the Certificate of Consent issued was not registered with the Land Registry Office within the statutory timeline.
240 m away · filed Sep 2, 2025 · Approved
111 Prairie Dr · Consent
To permit a lot addition to create a lot for redevelopment.
230 m away · filed Oct 6, 2024 · Approved
109 Prairie Dr · Consent
To permit a lot addition to create a lot for redevelopment.
250 m away · filed Sep 28, 2024 · Approved
135 Leyton Ave · Minor variance
To demolish existing dwelling and to construct a new detached dwelling.
250 m away · filed Oct 26, 2022 · Approved
135 Leyton Ave · Consent
To obtain consent to sever lots into two residential lots. Cross reference minor variances applications A0222/22SC & A0223/22SC.
250 m away · filed Oct 26, 2022 · Approved
135 Leyton Ave · Minor variance
To demolish existing dwelling and to construct a new detached dwelling.
250 m away · filed Oct 21, 2022 · Approved
6 Ardell Ave · Minor variance
To construct a new two-storey detached dwelling. Cross-Reference Consent Application B0073/21SC and Minor Variance Application A0388/21SC. Applications for consent and minor variances are to be considered jointly by the Committee of Adjustment. NOTE: This application was deferred at the June 2, 2022 hearing to correctly identify variances associated with this development proposal.
200 m away · filed Nov 22, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.