Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

55 Rankin Cres

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed structural changes to roof and replacment of four make-up air units on the roof of an existing apartment building.

    Applied Oct 6, 2020 · completed Oct 30, 2020 · Permit 20 203366 HVA

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install backflow prevention device.

    Applied Nov 27, 2018 · issued Dec 19, 2018 · completed Sep 27, 2019 · Permit 18 261578 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    160 m away · filed Sep 3, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    160 m away · filed Apr 2, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    160 m away · filed Aug 16, 2024 · Approved

  • 83 Perth Ave · Minor variance

    To legalize and to maintain the rear second floor addition (conversion of the existing rear second floor deck into habitable space) and the rear dormer third floor addition that were constructed without an authorized building permit. Also, to permit the reconstruction of a rear third floor rooftop deck (previously constructed without an authorized building permit and since removed).

    220 m away · filed Aug 2, 2024 · Approved

  • 230 Sterling Rd · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. The existing rear basement walkout stairs, rear ground floor concrete pad, and a portion of the rear ground floor deck will be demolished.

    230 m away · filed Aug 1, 2024 · Approved

  • 59 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition (within the attic), a rear two-storey addition with a second storey balcony and a rooftop deck (accessed from the third storey). There will be two residential dwelling units on this lot.

    230 m away · filed Jan 8, 2024 · Approved

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    240 m away · filed Dec 12, 2023 · Approved

  • 1423 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 927-2022 for an 18-storey mixed-use building with a 6-storey podium, and one level of underground parking) by constructing two additional storeys, increasing the overall building height and residential gross floor area.

    180 m away · filed Jul 5, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.