Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

550 Glebeholme Blvd

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · HVAC: SFD/Semi/TH

    Proposed new HVAC system for existing Single Family Dwelling

    Applied Sep 7, 2023 · issued Sep 29, 2023 · completed Jun 11, 2024 · Permit 23 199313 MSA

    Closed
  • Plumbing

    Plumbing - Basement underpinning -37 Linear Meters

    Applied May 9, 2023 · issued May 24, 2023 · completed Jun 11, 2024 · Permit 23 142989 PLB

    Closed
  • Small residential project · Underpinning

    Basement underpinning -37 Linear Meters

    Applied May 8, 2023 · issued May 24, 2023 · completed Jun 11, 2024 · Permit 23 142989 BLD

    Closed
  • Plumbing

    Plumbing - Basement underpinning -37 Linear MetersDRAWINGS MISSING

    Applied Apr 25, 2023 · completed May 8, 2023 · Permit 23 137675 PLB

    Cancelled
  • Small residential project · Underpinning

    Basement underpinning -37 Linear Meters

    Applied Apr 25, 2023 · completed May 8, 2023 · Permit 23 137675 BLD

    Cancelled
  • Small residential project · Garage

    Demolish and build private detached garage at rear.

    Applied May 17, 2005 · issued May 17, 2005 · completed Jun 11, 2024 · Permit 05 133153 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 564 Milverton Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (mudroom) with stairs, in line with the existing rear one-storey partial addition.

    190 m away · filed Jan 16, 2026 · Approved

  • 279 Springdale Blvd · Minor variance

    To legalize and to maintain the hard landscaping (pavers) in the front yard of the existing two-storey detached dwelling, which were constructed without the benefit of an authorized building permit.

    150 m away · filed Jan 16, 2026 · Postponed

  • 616 Milverton Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition. Also, to partially enclose the front porch and to construct a basement walkout. There will be a total of two residential dwelling units on this lot.

    100 m away · filed Mar 18, 2025 · Approved

  • 564 Glebeholme Blvd · Minor variance

    To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs.

    40 m away · filed Jan 14, 2025 · Approved

  • 313 Wolverleigh Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front porch (which will be enclosed) and to reconstruct the front stairs.

    140 m away · filed Aug 9, 2023 · Approved

  • 253 Springdale Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey front addition (enclosing the existing front porch).

    230 m away · filed Sep 8, 2022 · Approved

  • 489 Glebeholme Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a one-storey front addition (partial enclosure of the existing front porch) and a two-storey rear addition.

    240 m away · filed Jan 21, 2022 · Approved

  • 526 Strathmore Blvd · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    240 m away · filed Nov 8, 2021 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.