Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

555 Parliament St

The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Administrative permit for work occuring at 549. 551, 553 PARLIAMENT ST, 24-213893 (553 Parliament St.)

    Applied Sep 17, 2024 · issued Oct 18, 2024 · Permit 24 214378 BLD

    Permit issued
  • Addition or alteration · Other

    Proposed party wall administrative permit for the demolition of existing framed rear additions and underpinning original masonary foundation wall at 553 Parliament street.

    Applied Nov 9, 2023 · issued Nov 13, 2023 · Permit 23 224335 BLD

    Permit issued
  • Addition or alteration · Other

    Proposed party wall administration for the demolition of existing framed rear additions and underpinning original masonary foundation wall at 553 Parliment St.

    Applied Oct 19, 2023 · completed Nov 2, 2023 · Permit 23 216441 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 21 Metcalfe St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.

    210 m away · filed Mar 11, 2026 · Approved

  • 20 Aberdeen Ave · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.

    220 m away · filed Sep 4, 2024 · Approved

  • 603 1/2 Parliament St · Minor variance

    To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.

    150 m away · filed Jul 18, 2024 · Approved

  • 17 Metcalfe St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.

    220 m away · filed Apr 22, 2024 · Approved

  • 49 Metcalfe St · Minor variance

    To alter the existing three-storey semi-detached dwelling by demolishing the existing front covered porch, constructing a new covered front porch with stairs and relocating the air conditioner unit from the front of the lot (encroaching beyond the front yard lot line) to the front corner of the lot (partially encroaching beyond the front yard lot line), as approved by Minor Variance Decision A1380/22TEY. This current application is necessitated to correctly identify variances that were not included in the previous Minor Variance Decision.

    130 m away · filed Dec 28, 2023 · Approved

  • 51 Metcalfe St · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).

    130 m away · filed Dec 6, 2023 · Approved

  • 37 Winchester St · Consent

    To sever the existing lot into two lots and to create a new easement.

    120 m away · filed May 11, 2023 · Approved

  • 71 Winchester St · Minor variance

    To alter the existing two-and-one-half-storey, 8-unit detached dwelling by constructing a third storey addition, a rear basement addition, and to reconstruct the existing fire escape staircase.

    130 m away · filed Mar 20, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.